    • [Volume. 1970(1)]----------
    • CONTENTS
    • Preface = Ⅰ-ⅲ
    • CHAPTER I : SUMMARY
    • Assessment of the U. S. Electric Power Situation = Ⅰ-1-1
    • General = Ⅰ-1-1
    • Areas of Problems and Progress = Ⅰ-1-1
    • Why Quality of Service is Critical = Ⅰ-1-4
    • Major Needs and Imperatives = Ⅰ-1-5
    • The Need to Recognize the Situation for What it is = Ⅰ-1-5
    • The Need to Distinguish Between Short-Range Problems and Long-Range Objectives = Ⅰ-1-5
    • The Need for improved Site Selection Procedures = Ⅰ-1-6
    • The Need for a National Energy Policy = Ⅰ-1-6
    • The Need for Intensified Research and Development = Ⅰ-1-8
    • Financial Imperatives = Ⅰ-1-9
    • Summary of Survey Findings = Ⅰ-1-10
    • Introduction = Ⅰ-1-10
    • Structure of the Power Industry = Ⅰ-1-10
    • General = Ⅰ-1-10
    • Observations = Ⅰ-1-12
    • The Demand Outlook = Ⅰ-1-12
    • The 1964 Outlook = Ⅰ-1-12
    • The 1970 Outlook = Ⅰ-1-12
    • Major Demand Components = Ⅰ-1-13
    • Discussion = Ⅰ-1-13
    • The Supply Outlook = Ⅰ-1-14
    • The Situation in 1964 = Ⅰ-1-14
    • Changes in Conditions = Ⅰ-1-15
    • The 1970 Survey Findings = Ⅰ-1-16
    • Capacity = Ⅰ-1-16
    • Fuel Supplies = Ⅰ-1-19
    • Transmission = Ⅰ-1-21
    • Reliability = Ⅰ-1-21
    • The Relationship Between Power and the Environment = Ⅰ-1-22
    • The 1964 Outlook = Ⅰ-1-22
    • 1970 Survey Findings = Ⅰ-1-22
    • Air Quality (Fossil Fuels) = Ⅰ-1-23
    • Air Quality (Nuclear Fuels) = Ⅰ-1-24
    • Water Quality = Ⅰ-1-25
    • Land Use = Ⅰ-1-26
    • Esthetics = Ⅰ-1-27
    • General = Ⅰ-1-27
    • Research And Development Needs = Ⅰ-1-28
    • General = Ⅰ-1-28
    • organizational Mechanisms = Ⅰ-1-29
    • Financing Mechanisms = Ⅰ-1-33
    • The Price Outlook = Ⅰ-1-33
    • The 1964 Survey Outlook = Ⅰ-1-33
    • The 1970 Survey Outlook = Ⅰ-1-34
    • TABLES
    • 1.1 Categories of Electric Power Use = Ⅰ-1-13
    • 1.2 Projected Growth of Utility Generating Capacity = Ⅰ-1-17
    • 1.3 Distribution of Generating Capacity = Ⅰ-1-18
    • 1.4 Projected Distribution of Fuel Use For Thermal Power Generation 1970-1990 = Ⅰ-1-19
    • 1.5 Projected Annual Fuel Requirements For Thermal Power Generation = Ⅰ-1-20
    • 1.6 Estimated Nationwide Discharges of Airborne Pollutants-1968 = Ⅰ-1-23
    • 1.7 Major Research and Development Needs in the Field of Electric Power = Ⅰ-1-30
    • 1.8 Cost of Electricity to Ultimate Consumer = Ⅰ-1-34
    • FIGURES
    • 1.1 The Electric Power Industry-1970 = Ⅰ-1-11
    • CHAPTER 2 : STRUCTURE OF THE ELECTRIC POWER INDUSTRY
    • Historical Background of the Industry = Ⅰ-2-1
    • Ownership and Structure = Ⅰ-2-2
    • Investor-Owned Systems = Ⅰ-2-4
    • Federal Systems = Ⅰ-2-5
    • Public Non-Federal Systems = Ⅰ-2-5
    • Cooperative Systems = Ⅰ-2-6
    • Changes in Industry Size, Structure, and Ownership = Ⅰ-2-7
    • Ceombination Electric and Gas Utilities = Ⅰ-2-8
    • Regulation = Ⅰ-2-9
    • TABLES
    • 2.1 Number of Electric Utility Systems by Class of Ownership = Ⅰ-2-2
    • 2.2 Number of Electric Utility Systems by Ownership Classification, Region, and i Function = Ⅰ-2-3
    • 2.3 Number of Electric Utility Systems in the Contiguous U. S. by Size and Ownership = Ⅰ-2-7
    • 2.4 Selected Characteristics of Classes A and B Investor-Owned Combination Utilities = Ⅰ-2-9
    • CHAPTER 3 : THE PROJECTED GROWTH IN THE USE OF ELECTRIC POWER
    • Introduction = Ⅰ-3-1
    • Characteristics of Electric Loads = Ⅰ-3-1
    • Demand For Electricity = Ⅰ-3-3
    • Cost Factors Influencing Demand for Electricity = Ⅰ-3-4
    • Environmental Protection = Ⅰ-3-5
    • Weather = Ⅰ-3-6
    • Potential Load Building Developments = Ⅰ-3-6
    • Industry = Ⅰ-3-6
    • Process Heating = Ⅰ-3-6
    • Electric-Arc Steel-Making Furnace = Ⅰ-3-6
    • Induction Heating in Steel Industry = Ⅰ-3-7
    • Electro-Organic Synthesis = Ⅰ-3-7
    • Other Industrial Applications = Ⅰ-3-7
    • Residential Electric Requirements = Ⅰ-3-8
    • Transportation = Ⅰ-3-9
    • The Electric Car = Ⅰ-3-9
    • Electrified Transport-Railroads = Ⅰ-3-10
    • Rapid Transit = Ⅰ-3-10
    • Outdoor Lighting = Ⅰ-3-11
    • Need For Load Projections = Ⅰ-3-11
    • National and Regional Projections = Ⅰ-3-12
    • Projections of Electric Energy Requirements and Peak Demands to 1990 = Ⅰ-3-13
    • Energy Requirements by Class of Use = Ⅰ-3-17
    • TABLES
    • 3.1 Electrically Heated Dwellings in the United States, 1964-I990 = Ⅰ-3-8
    • 3.2 Saturation Levels for Selected Electrical Appliances, Contiguous United States = Ⅰ-3-8
    • 3.3 Approximate Wattage Rating and Estimated Annual Kilowatt-Hour Consumption of Electrical Appliances Under Normal Use in 1969 = Ⅰ-3-9
    • 3.4 Comparison of Staff Econometric Study Results and Regional Advisory Committee Projections for Residential and Total Electric Utility Energy Requirements, 1980-1990 = Ⅰ-3-13
    • 3.5 Electric Utility Energy Requirements and Peak Loads by Power Supply Areas and Regions-1970, 1980, and 1990 = Ⅰ-3-14
    • 3.6 Annual Electric Energy Requirements by Class of Use, Contiguous United States = Ⅰ-3-18
    • 3.7 Projected Increases in Electric Energy Requirements by Class of Use, 1965-1990, Contiguous United States = Ⅰ-3-18
    • FIGURES
    • 3.1 Weekly Load Curve = Ⅰ-3-2
    • 3.2 Estimated 1970 Monthly Peak Demands-West and South Central Regions = Ⅰ-3-3
    • 3.3 Annual Production of Electric Energy Per Capita-Utility and Industrial = Ⅰ-3-3
    • 3.4 U. S. Energy Consumption, 1920-1990 = Ⅰ-3-4
    • 3.5 Growth of Electricity Production and Gross National Product, 1929-1990 = Ⅰ-3-13
    • 3.6 National Power Survey Regions and Power Supply Areas = Ⅰ-3-16
    • 3.7 Electric Utility Energy Requirements, 1880-1990 = Ⅰ-3-17
    • CHAPTER 4 : FOSSIL FUELS AND FUEL TRANSPORT
    • Fuel Requirements = Ⅰ-4-1
    • Coal = Ⅰ-4-2
    • Coal Resources = Ⅰ-4-4
    • Coal Distribution = Ⅰ-4-5
    • Physical Characteristics of Deposits = Ⅰ-4-6
    • Chemical Properties and Their Effect on Coal's Competitive Position = Ⅰ-4-7
    • Low-Sulfur Coal for Electric Utilities = Ⅰ-4-8
    • Mine-Mouth Plants = Ⅰ-4-10
    • Coal Conversion = Ⅰ-4-10
    • Natural Gas = Ⅰ-4-12
    • National Gas Survey = Ⅰ-4-14
    • Natural Gas Resources = Ⅰ-4-15
    • Plowshare Program = Ⅰ-4-16
    • Natural Gas Imports = Ⅰ-4-I6
    • Residual Fuel Oil = Ⅰ-4-17
    • Residual Fuel Oil Supply = Ⅰ-4-17
    • Oil Import Control Program = Ⅰ-4-19
    • Low-Sulfur Residual Oil for the Electric Power Industry = Ⅰ-4-19
    • Oil Shale = Ⅰ-4-20
    • Fuel Transport = Ⅰ-4-20
    • Coal Transport = Ⅰ-4-21
    • Rail Transport = Ⅰ-4-21
    • Water Transport = Ⅰ-4-21
    • Pipeline-Slurry Transport = Ⅰ-4-22
    • Transportation of Natural Gas = Ⅰ-4-24
    • Liquefied Natural Gas (LNG) = Ⅰ-4-24
    • International Transport = Ⅰ-4-24
    • Ocean Transport of Residual Fuel Oil = Ⅰ-4-25
    • Interfuel Competition = Ⅰ-4-25
    • Factors Affecting InterfueI Competition = Ⅰ-4-26
    • Air Pollution = Ⅰ-4-26
    • High-Voltage Transmission = Ⅰ-4-26
    • Transport Limitations = Ⅰ-4-27
    • Nature of Fuel Demand by Electric Utilities = Ⅰ-4-27
    • Characteristics of the Fuel Supply Market = Ⅰ-4-27
    • International Trade = Ⅰ-4-28
    • Regional Outlook = Ⅰ-4-28
    • TABLES
    • 4.1 Annual Consumption of Fossil Fuels by Electric Utility Power Plants, 1961-1970 and Projected to 1990 = l-4-2
    • 4.2 Total Domestic and Utility Consumption of Coal, 1961-1970 = Ⅰ-4-3
    • 4.3 Coal Production from Strip and Auger Mines = Ⅰ-4-4
    • 4.4 Coal Prices-1965, 1968, and 1969 = Ⅰ-4-4
    • 4.5 Total Estimated Remaining Coal Resources of the United States, January 1, 1967 = Ⅰ-4-5
    • 4.6 The Remaining U. S. Coal Resources by Basin or Region, and by Thickness of Beds, January 1, 1967 = Ⅰ-4-7
    • 4.7 Remaining Coal Reserves of the United States, by Type, Sulfur Content, and State, January 1, 1965 = Ⅰ-4-9
    • 4.8 Units of 500-Megawatt Capacity and Over in Mine-Mouth Electric Plants = Ⅰ-4-11
    • 4.9 Process Summary for Synthetic Pipeline-Gas Plants = Ⅰ-4-13
    • 4.10 Economics of Synthetic Pipeline-Gas Processes, Summary = Ⅰ-4-13
    • 4.11 Total Domestic and Utility Consumption of Natural Gas, 1961-1970 = Ⅰ-4-14
    • 4.12 Estimated Total Proved Recoverable Reserves of Natural Gas in the United States = Ⅰ-4-15
    • 4.13 Total Domestic and Utility Consumption of Fuel Oil, 1961-1970 = Ⅰ-4-17
    • 4.14 Domestic Supply of Residual Fuel Oil, I961-1970 = Ⅰ-4-18
    • 4.15 Bituminous Coal and Lignite Shipments to Electric Utilities, by Mode of Trans-port, 1959 and 1968 = Ⅰ-4-21
    • 4.16 Fuel Consumption by Electric Utilities, 1960 and 1969, and Average Growth Rates, by Census Regions = Ⅰ-4-25
    • 4.17 Fossil Fuel Use for Electric Power Generation by Census Regions, as a Percent of Total Btu, 1960 and 1969 = Ⅰ-4-26
    • FIGURES
    • 4.1 Projected Generation Mix = Ⅰ-4-1
    • 4.2 Estimated Annual Electric Utility Generation by Primary Energy Sources = Ⅰ-4-1
    • 4.3 Estimated Annual Fossil Fuel Requirements for Electric Utility Generation = Ⅰ-4-2
    • 4.4 Relative Use of Coal, Gas, and Oil in Projected Fossil-Fueled Generation = Ⅰ-4-4
    • 4.5 Distribution of Fossil Fuel Reserves = Ⅰ-4-6
    • 4.6 Average Unit Train Rates = Ⅰ-4-22
    • 4.7 Black Mesa-Mohave Coal-Slurry Pipeline = Ⅰ-4-23
    • 4.8 Gas Liquefying and Storage Facilities = Ⅰ-4-24
    • 4.9 Relative Changes in the Wholesale Price Index of Fossil Fuels = Ⅰ-4-28
    • 4.10 Projected Fossil Fuel Requirements for Electric Power Generation, by Regions = Ⅰ-4-30
    • CHAPTER 5 : FOSSIL-FUELED STEAM-ELECTRIC GENERATION
    • Introduction = Ⅰ-5-1
    • Sizes of Units = Ⅰ-5-2
    • Sizes of Plants = Ⅰ-5-3
    • Average Costs = Ⅰ-5-4
    • Steam Conditions = Ⅰ-5-5
    • Heat Rates = Ⅰ-5-6
    • Base lload Units = Ⅰ-5-7
    • Base Load Units with Built-in Peaking Capability = Ⅰ-5-8
    • Peaking Units = Ⅰ-5-8
    • Changing Operational Patterns for Older Units = Ⅰ-5-8
    • Maintenance = Ⅰ-5-9
    • P$$\acute e$$rformance of New Units = Ⅰ-5-10
    • Trends In Boilers q = Ⅰ-5-10
    • Prospects for Combined Cycles = Ⅰ-5-12
    • Gas Turbine-Steam Turbine = Ⅰ-5-12
    • Combined Steam or Power-Incineration Plants = Ⅰ-5-12
    • Automation of Steam-Electric Plants = Ⅰ-5-13
    • FIGUEES
    • 5.1 Fossil-Fueled Steam-Electric Generating Capacity = Ⅰ-5-1
    • 5.2 150-Megawatt Unit in Paradise Plant = Ⅰ-5-2
    • 5.3 Largest Fossil-FueIed Steam-Electric Turbine-Generators in Service-1900-1990 = Ⅰ-5-3
    • 5.4 Genoa Nuclear and Coal-Fired Plants = Ⅰ-5-3
    • 5.5 Average Investment Cost Per Kilowatt of Total Installed Steam-Electric Capacity = Ⅰ-5-4
    • 5.6 Total Costs of Producing Steam-Electric Power = Ⅰ-5-4
    • 5.7 Asbury Steam-Electric Plant = Ⅰ-5-5
    • 5.8 Manpower Requirements for Operation and Maintenance of Modern Coal-Fired and Gas-Fired Steam-Electric Plants = Ⅰ-5-5
    • 5.9 Maximum Designed Throttle Pressures of Turbines Installed Each Year = Ⅰ-5-6
    • 5.10 Maximum Designed Throttle Temperatures of Turbines Installed Each Year = Ⅰ-5-6
    • 5.11 Heat Rates of Fossil-Fueled Steam-Electric Plants = Ⅰ-5-7
    • 5.12 The 1606-Megawatt Haynes Steam-Electric Plant = Ⅰ-5-7
    • 5.13 Turbo-Generator in the Fort Martin Plant = Ⅰ-5-9
    • 5.14 Maximum Capacity of Boilers Installed Each Year = Ⅰ-5-11
    • 5.15 Northport Steam-Electric Plant = Ⅰ-5-11
    • 5.16 Riverbend Steam-Electric Plant = Ⅰ-5-12
    • 5.17 Combined Gas Turbine-Steam Turbine Cycle = Ⅰ-5-12
    • CHAPTER 6 : NUCLEAR POWER
    • Introduction = Ⅰ-6-1
    • Accelerated Growth of Nuclear Power Generation = Ⅰ-6-1
    • Regulation = Ⅰ-6-5
    • Plant Licensing = Ⅰ-6-5
    • Construction Permit I-6-5
    • Operating License = Ⅰ-6-7
    • Operator Licensing = Ⅰ-6-7
    • Nuclear Insurance = Ⅰ-6-9
    • Types of Reactor Systems in Service and Being Built = Ⅰ-6-9
    • Pressurized Water Reactor = Ⅰ-6-9
    • Boiling Water Reactor = Ⅰ-6-9
    • Nuclear Fuels = Ⅰ-6-10
    • Fuel Requirements and Supply = Ⅰ-6-10
    • Fuel Cycles = Ⅰ-6-11
    • Uranium Fuel Cycle = Ⅰ-6-11
    • Head-End Processes = Ⅰ-6-11
    • Fuel Fabrication = Ⅰ-6-11
    • Irradiation in Reactor = Ⅰ-6-12
    • Tail-End Processes = Ⅰ-6-12
    • Thorium Cycle = Ⅰ-6-12
    • Plutonium Cycle = Ⅰ-6-12
    • Fuel Management = Ⅰ-6-12
    • Nuclear Plant Costs = Ⅰ-6-13
    • Capital Costs = Ⅰ-6-13
    • Nuclear Plant Efficiencies = Ⅰ-6-13
    • Nuclear Fuel Costs = Ⅰ-6-14
    • Operation and Maintenance Costs = Ⅰ-6-14
    • Quality Assurance = Ⅰ-6-15
    • Plant Operations = Ⅰ-6-15
    • Plant Availability = Ⅰ-6-15
    • Loading of Generating Units = Ⅰ-6-16
    • Performance During System Disturbance = Ⅰ-6-16
    • Computer Applications in Nuclear Plant Operation = Ⅰ-6-17
    • Personnel Requirements = Ⅰ-6-17
    • Training of Personnel = Ⅰ-6-17
    • Nuclear Power Environmental Considerations = Ⅰ-6-17
    • Siting Criteria = Ⅰ-6-17
    • Effects on Water Resources = Ⅰ-6-19
    • Reactor Safety = Ⅰ-6-19
    • Development of Radiation Standards = Ⅰ-6-19
    • Safety Protection for Nuclear Reactors = Ⅰ-6-19
    • Radioactivity in Condenser Cooling Water = Ⅰ-6-20
    • Radioactive Discharges to the Atmosphere = Ⅰ-6-20
    • Reactor Waste Management = Ⅰ-6-20
    • Possible Future Reactor Types = Ⅰ-6-21
    • Advanced Converter and Low Gain Breeder Concepts = Ⅰ-6-21
    • High Temperature Gas-Cooled Reactor = Ⅰ-6-21
    • Light Water Breeders = Ⅰ-6-21
    • Molten Salt Breeder Reactor = Ⅰ-6-22
    • Fast Neutron Breeder Reactors = Ⅰ-6-22
    • Liquid Metal Fast Breeder Reactor = Ⅰ-6-22
    • Gas-Cooled Fast Breeder Reactor = Ⅰ-6-23
    • TABLES
    • 6.1 Nuclear Electric Generating Units, Existing and Scheduled = Ⅰ-6-2
    • 6.2 Fuel Cycle Costs for a 1,000-MW Plant = Ⅰ-6-15
    • 6.3 Commercial Nuclear Reactor Availability Factors = Ⅰ-6-16
    • FIGURES
    • 6.1 Nuclear Electric Generating Units, Existing and Scheduled = Ⅰ-6-6
    • 6.2 Projected Nuclear, Hydro, and Fossil-Fueled Capacity = Ⅰ-6-7
    • 6.3 Nine Mile Point Nuclear Power Plant = Ⅰ-6-7
    • 6.4 Nuclear Electric Capacity, Existing and Projected = Ⅰ-6-8
    • 6.5 Dresden Nuclear Power Plant = Ⅰ-6-10
    • 6.6 Uranium Fuel Bundles = Ⅰ-6-10
    • 6.7 Estimated Effects of Fast Breeder Introduction on Uranium Requirements = Ⅰ-6-11
    • 6.8 Nuclear Fuel Cycle for Light Water Reactor = Ⅰ-6-11
    • 6.9 Browns Ferry Nuclear Power Plant = Ⅰ-6-13
    • 6.10 Estimated Operation and Maintenance Costs for Light Water Reactor Plants = Ⅰ-6-15
    • 6.11 Reinforcing Steel at Diablo Canyon Nuclear Power Plant = Ⅰ-6-16
    • 6.12 Shipping of Browns Ferry Nuclear Reactor Vessel I'll = Ⅰ-6-17
    • 6.13 Shipping of Steam Generator for Oconee Nuclear Power Plant = Ⅰ-6-18
    • 6.14 Handling Reactor Waste = Ⅰ-6-20
    • 6.15 Fort StVrain Nuclear Power Plant = Ⅰ-6-21
    • 6.16 Steam Generator Being Prepared for Testing = Ⅰ-6-22
    • CHAPTER 7 : CONVENTIONAL AND PUMPED STORAGE HYDROELECTRIC POWER
    • Introduction = Ⅰ-7-1
    • Operating Characteristics = Ⅰ-7-1
    • Conventional Developments = Ⅰ-7-1
    • Pumped Storage Developments = Ⅰ-7-3
    • Use in Serving Loads = Ⅰ-7-4
    • Trends in Development = Ⅰ-7-5
    • Existing Developments = Ⅰ-7-8
    • Trends in Ownership = Ⅰ-7-9
    • Projects Existing and Under Construction = Ⅰ-7-9
    • Developments Under FPC Licenses = Ⅰ-7-11
    • Processing Applications = Ⅰ-7-11
    • Projects Under License = Ⅰ-7-18
    • Relicensing or Federal Takeover = Ⅰ-7-19
    • Development Under Comprehensive Basin Plans = Ⅰ-7-19
    • Federal-State Planning Activities = Ⅰ-7-19
    • Water Resource Appraisals = Ⅰ-7-20
    • Projected Developments = Ⅰ-7-21
    • Hydroelectric Power Potential = Ⅰ-7-21
    • Possible Future Projects = Ⅰ-7-21
    • Imports from Canada = Ⅰ-7-23
    • Tidal Power = Ⅰ-7-30
    • TABLES
    • 7.1 Number and Capacity of Conventional Hydroelectric Plants = Ⅰ-7-8
    • 7.2 Conventional Hydroelectric Capacity by Class of Ownership = Ⅰ-7-9
    • 7.3 Federal Conventional Hydroelectric Capacity = Ⅰ-7-9
    • 7.4 Conventional Hydroelectric Capacity, Existing and Under Construction = Ⅰ-7-13
    • 7.5 Pumped Storage Projects in the United States = Ⅰ-7-17
    • 7.6 Possible New Conventional Hydroelectric Projects and Capacity Additions, Projected to 1990 = Ⅰ-7-24
    • 7.7 Possible New Pumped Storage Capacity, Projected to 1990 = Ⅰ-7-26
    • FIGURES
    • 7.1 Hydroelectric Capacity Existing and Projected to 1990 = Ⅰ-7-2
    • 7.2 Cabin Creek Pumped Storage Project = Ⅰ-7-4
    • 7.3 Generation to Meet Weekly Load = Ⅰ-7-5
    • 7.4 Robert Moses Niagara Power Plant = Ⅰ-7-6
    • 7.5 Sketch of Kinzua Pumped Storage Project = Ⅰ-7-7
    • 7.6 Muddy Run Recreation Park = Ⅰ-7-8
    • 7.7 Map and Profile of Columbia River Basin = Ⅰ-7-10
    • 7.8 Grand Coulee Dam with Artist's Conception of the New Third Power Plant = Ⅰ-7-11
    • 7.9 Conventional Hydroelectric Capacity, Existing and Under Constructivn = Ⅰ-7-12
    • 7.10 Northfield Mountain Pumped Storage Project = Ⅰ-7-16
    • 7.11 Keowee Hydroelectric Project = Ⅰ-7-18
    • 7.12 National Wild and Scenic Rivers System = Ⅰ-7-22
    • 7.13 Conventional Hydroelectric Capacity, New and Expanded = Ⅰ-7-28
    • 7.I4 Reversible Hydroelectric Capacity, Existing and Under Construction as of December 31, 1970, and Projected to 1990 = Ⅰ-7-29
    • CHAPTER 8 : GAS TURBINES, DIESELS, AND TOTAL ENERGY SYSTEMS
    • Introduction = Ⅰ-8-1
    • Gas Turbines = Ⅰ-8-2
    • Installations and Scheduled Additions = Ⅰ-8-6
    • Diesel Engines = Ⅰ-8-6
    • Total Energy Systems = Ⅰ-8-7
    • TABLES
    • 8.1 Total Energy Systems = Ⅰ-8-8
    • 8.2 Total Energy Installations = Ⅰ-8-8
    • FIGURES
    • 8.1 Diesel Power Plant No. 2 at Freeport, N. Y = Ⅰ-8-1
    • 8.2 Gas Turbines at Leland Street Substation, Framingham, Mass = Ⅰ-8-1
    • 8.3 Simple Open-Cycle Gas Turbine = Ⅰ-8-3
    • 8.4 Simple Open-Cycle Gas Turbine with Regenerationt = Ⅰ-8-3
    • 8.5 Cornplete-Cycle Gas Turbine = Ⅰ-8-3
    • 8.6 Eight Aircraft jet Engines Drive Four Expander Turbines Direct-Connected to 3,600 RPM Generator = Ⅰ-8-4
    • 8.7 Gas Turbines with Heat Recovery Boiler Complex = Ⅰ-8-5
    • 8.8 Gas and Steam Turbines in San Angelo Power Plant = Ⅰ-8-6
    • 8.9 Six Cylinder, 6,000-Horsepower Diesel Generator Set = Ⅰ-8-6
    • 8.10 Remote Controlled Diesel Units = Ⅰ-8-7
    • CHAPTER 9 : OTHER FORMS OF GENERATION
    • Introduction = Ⅰ-9-1
    • Magnetohydrodynamics = Ⅰ-9-2
    • Open Cycle = Ⅰ-9-2
    • Closed Cycle-Gas = Ⅰ-9-4
    • Liquid Metal = Ⅰ-9-4
    • Electrogasdynamics = Ⅰ-9-5
    • Fusion Reactor = Ⅰ-9-6
    • Fuel Cells = Ⅰ-9-9
    • Tbermionic Generation = Ⅰ-9-10
    • Tbermionic Generation = Ⅰ-9-I2
    • Geothermal Generation = Ⅰ-9-13
    • Solar Generation = Ⅰ-9-14
    • FIGURES
    • 9.1 Open-Cycle MHD Generation = Ⅰ-9-3
    • 9.2 Combined Open-Cycle MHD-Steam Generation = Ⅰ-9-3
    • 9.3 Electrogasdynamic Principle = Ⅰ-9-6
    • 9.4 D-T Fusion Power Plant = Ⅰ-9-8
    • 9.5 Fusion Reactor with Direct Conversion = Ⅰ-9-8
    • 9.6 Hydrogen-Oxygen Fuel Cell = Ⅰ-9-9
    • 9.7 Artist's conception of 20-MW Fuel Cell Power Plant = Ⅰ-9-10
    • 9.8 Thermionic Converter = Ⅰ-9-10
    • 9.9 Thermoelectric Converter = Ⅰ-9-12
    • 9.10 The Geysers Geothermal Plant = Ⅰ-9-14
    • CHAPTER 10 : DISPOSAL OF WASTE HEAT FROM STEAM-ELECTRIC PLANTS
    • Introduction = Ⅰ-10-1
    • Types of Cooling = Ⅰ-10-1
    • Once-Through Cooling = Ⅰ-10-1
    • Cooling Ponds = Ⅰ-10-3
    • Wet Cooling Towers = Ⅰ-10-3
    • Mechanical Draft Towers = Ⅰ-10-4
    • Natural Draft Towers = Ⅰ-10-5
    • Dry Cooling Towers = Ⅰ-10-6
    • Cost of Coc>ling Water Systems = Ⅰ-10-7
    • Esthetics of Waste Heat Disposal Systems = Ⅰ-10-8
    • Effects of Thermal Discharges on Ecology = Ⅰ-10-8
    • Effects on Water = Ⅰ-10-9
    • Effects on Aquatic Life = Ⅰ-10-9
    • Effects on Water Uses = Ⅰ-10-10
    • Possible Beneficial Uses of Waste Heat = Ⅰ-10-10
    • State and Federal Regulation of Water Quality = Ⅰ-10-12
    • Water Quality Act of 1965 = Ⅰ-10-12
    • Water Quality Improvement Act of 1970 = Ⅰ-10-14
    • Refuse Act of 1899 = Ⅰ-10-14
    • Other Regulatory Authorities = Ⅰ-10-15
    • Analyses of Cooling Systems for Projected Steam-Electric Plants = Ⅰ-10-15
    • Basis of Analyses = Ⅰ-10-16
    • Impacts on Water Resources = Ⅰ-10-16
    • Effects on Power Costs = Ⅰ-10-17
    • Overall Impacts = Ⅰ-10-17
    • Studies and Research = Ⅰ-10-20
    • TABLES
    • 10.1 Comparative Costs of Cooling Water Systems for Steam-Electric Plants = Ⅰ-10-8
    • 10.2 Estimated Cooling Water Requirements for 1,000-Megawatt Steam-Electric Plant Operating at Full Load = Ⅰ-10-17
    • 10.3 Estimated National Water Use for Steam-Electric Power Plant Cooling = Ⅰ-10-17
    • 10.4 Estimated Costs of Cooling Facilities = Ⅰ-10-20
    • FIGURES
    • 10.1 Diffuser Pipes for Heated Water Dispersal at 3,500-Megawatt Browns Ferry Nuclear Power Plant = Ⅰ-10-2
    • 10.2 Typical Thermal Stratification of Reservoirs During Summer Months = Ⅰ-10-3
    • 10.3 The 1,200-Acre Cooling Pond for the 2,085-Megawatt Four Corners Power Plant = Ⅰ-10-4
    • 10.4 Spray Pond for the 490-Megawatt Canady Station = Ⅰ-10-4
    • 10.5 Use of Effluent from a Municipal Sewage Treatment Plant as Source of Cooling Water for the 435-Megawatt Nichols Plant = Ⅰ-10-5
    • 10.6 Mechanical Draft Cooling Towers at the 580-Megawatt Allen S. King Plant = Ⅰ-10-5
    • 10.7 Cooling Tower for the 200-Megawatt Naughton No. 2 Unit = Ⅰ-10-5
    • 10.8 Cooling Tower for the 125-Megawatt Mooreland No. 2 Unit = Ⅰ-10-6
    • 10.9 Natural Draft Cooling Towers at the 1,400-Megawatt Paradise Steam Plant = Ⅰ-10-6
    • 10.10 Air Cooled Condensing at the 20-Megawatt Unit in the Neil Simpson Station = Ⅰ-10-7
    • 10.11 Indirect Dry Cooling (Heller) System = Ⅰ-10-7
    • 10.12 Provision for Oyster Hatchery and Marine Museum in Cooling Water Discharge Basin for the Northport Plant = Ⅰ-10-11
    • 10.13 Cooling Lake for 563-Megawatt Montrose Power Plant = Ⅰ-10-12
    • 10.14 Possible Multiple Uses of Cooling Lake = Ⅰ-10-12
    • 10.15 Estimated Annual Withdrawal and Consumptive Use of Water for Condenser Cooling of Projected Steam-Electric Plants = Ⅰ-10-18
    • 10.16 Estimated Capital and Annual Costs for Cooling Water Facilities for Projected Steam-Electric Plants = Ⅰ-10-19
    • CHAPTER 11 : AIR POLLUTION
    • Introduction = Ⅰ-11-1
    • Sources and Quantities of Air Pollutants = Ⅰ-11-1
    • Legislation and Abatement Programs = Ⅰ-11-3
    • Air Pollution and Reliability of Electric Power Supply = Ⅰ-11-5
    • Emissions From Fossil-Fueled Power Plants = Ⅰ-11-5
    • Emissions from Combustion of Coal = Ⅰ-11-6
    • Emissions from Combustion of Fuel Oil = Ⅰ-11-6
    • Air Pollution from Combustion of Natural Gas = Ⅰ-11-6
    • Sulfur Oxides = Ⅰ-11-7
    • Nitrogen Oxides = Ⅰ-11-7
    • Particulates = Ⅰ-11-8
    • Other Pollutants from Fossil-Fueled Plants = Ⅰ-11-8
    • Gaseous Emissions From Nuclear Power Plants = Ⅰ-11-8
    • Status of Emission Control Technology for Fossil-Fueled Plants = Ⅰ-11-9
    • Control of Sulfur Oxides = Ⅰ-11-9
    • Absorption by Limestone or Dolomite = Ⅰ-11-9
    • Catalytic Oxidation = Ⅰ-11-10
    • Alkaline Scrubbing = Ⅰ-11-11
    • Solid Absorbents = Ⅰ-11-12
    • Other Processes = Ⅰ-11-12
    • Control of Nitrogen Oxides = Ⅰ-11-14
    • Control of Particulates = Ⅰ-II-15
    • Dispersion by Tall Stacks = Ⅰ-11-16
    • TABLES
    • 11.1 Estimated Nationwide Discharges of Airborne Pollutants = Ⅰ-11-2
    • 11.2 Estimated Emissions from Fossil-Fueled Steam-Electric Power Plants = Ⅰ-11-2
    • 11.3 Emission of Pollutants at Electric Power Plants-Average Rate by Type of Fossil Fuel = Ⅰ-11-3
    • 11.4 Ambient Air Quality Standards = Ⅰ-11-4
    • 11.5 Recommended Maximum Emission Rates of Sulfur Oxides = Ⅰ-11-5
    • 11.6 Estimated Electric Utility Production of Electric Power by Primary Energy Source = Ⅰ-11-6
    • 11.7 Estimated Costs of Sulfur Dioxide Removal Processes = Ⅰ-11-13
    • FIGURES
    • 11.1 Paradise Plant Showing Stack and Cooling Tower Plumes = Ⅰ-11-8
    • 11.2 Sulfur Removal by Wet Limestone Process = Ⅰ-11-10
    • 11.3 Catalytic oxidation Process for the Removal of So.,from Flue Gases = Ⅰ-11-11
    • 11.4 Kiyoura-Tokyo Institute of Technology Process for Removal of SO, from Flue Gases = Ⅰ-11-11
    • 11.5 Alkaline Scrubbing Process for Removal of SO, and Fly Ash from Flue Gases = Ⅰ-11-12
    • 11.6 Visual Effect of Electrostatic Precipitators = Ⅰ-11-16
    • 11.7 Effect of Emission Control Equipment at Lee Steam-Electric Plant = Ⅰ-11-16
    • 11.8 Two 800-Foot High Stacks at Monroe Power Plant = Ⅰ-11-17
    • 11.9 Old and New Stacks at Trenton Channel Power'Plant = Ⅰ-11-17
    • 11.10 Multiple Flue Smoke Stack = Ⅰ-11-17
    • C14APTER 12 : ESTHETICS AND LAND USE OF POWER FACILITIES
    • Introduction = Ⅰ-12-1
    • Distribution Facilities = Ⅰ-12-2
    • Overhead Distribution Lines = Ⅰ-12-2
    • Underground Distribution Lines = Ⅰ-12-3
    • Conversion of Existing Overhead Distribution to Underground = Ⅰ-12-5
    • Distribution Substations = Ⅰ-12-5
    • Transmission Facilities = Ⅰ-12-5
    • Overhead Transmission Lines = Ⅰ-12-7
    • Underground Transmission Lines = Ⅰ-12-9
    • Transmission Substations = Ⅰ-12-9
    • Gnerating Facilities = Ⅰ-12-9
    • Hydroelectric Plants = Ⅰ-12-9
    • Stearn-Electric Plants = Ⅰ-12-10
    • Gas Turbine and Internal Combustion Plants = Ⅰ-12-12
    • FIGURES
    • 12.1' Clutter Reduced by Eliminating Crossarins = Ⅰ-12-3
    • 12.2 Specially Designed Poles = Ⅰ-12-3
    • 12.3 Undergrounding of Distribution Facilities Improves a Scenic View = Ⅰ-12-4
    • 12.4 Pad Mounted Transformer = Ⅰ-12-4
    • 12.5 Plantings Screen a Distribution Substation = Ⅰ-12-6
    • 12.6 Alpine Substation = Ⅰ-12-6
    • 12.7 A 230-kV Transmission Line near Atlanta, Georgia = Ⅰ-12-7
    • 12.8 Ornamental Poles Used for Transmission Lines = Ⅰ-12-8
    • 12.9 The 138-kV Matilda Street Substation in Dallas = Ⅰ-12-9
    • 12.10 Libby Dam and Powerhouse = Ⅰ-12-10
    • 12.11 Trojan Nuclear Plant Design = Ⅰ-12-12
    • 12.12 Pilgrim Nuclear Plant Design = Ⅰ-12-12
    • CHAPTER 13 : TRASMISSION AND INTERCONNECTION
    • Introduction = Ⅰ-13-1
    • General Patterns of Transmission Systems = Ⅰ-13-4
    • Trends in Voltage Levels = Ⅰ-I3-4
    • Capacity of Overhead Lines = Ⅰ-13-5
    • Transmission Line Cost Considerations = Ⅰ-13-6
    • AC Terminal Equipment = Ⅰ-13-8
    • Switchgear = Ⅰ-13-8
    • Transformers = Ⅰ-13-9
    • Lightning Arresters = Ⅰ-13-10
    • Relaying, Metering, and Control = Ⅰ-13-10
    • Transmission System Overvoltages = Ⅰ-13-11
    • Transmission Line Outages = Ⅰ-13-12
    • System Stability = Ⅰ-13-12
    • High-Voltage DC Transmission = Ⅰ-I3-I4
    • Underground Transmission = Ⅰ-13-16
    • Power System Communications = Ⅰ-13-17
    • Research and Development Needs = Ⅰ-13-18
    • TABLES
    • 13.1 Transmission Line Mileages in U. S.-Actual and Projected = Ⅰ-13-4
    • 13.2 Actual Costs of Specific ac Lines = Ⅰ-13-7
    • 13.3 Transmission Line Outages, 1950-1964 = Ⅰ-13-13
    • 13.4 High-Voltage Direct-Current Power Transmission Projects = Ⅰ-13-14
    • FIGURES
    • 13.1 Transmission System, 1970 = Ⅰ-13-2
    • 13.2 Maximum ac Voltage in Use-1883-1970 = Ⅰ-13-5
    • 13.3 Steel Tower on 765-kV Transmission System = Ⅰ-13-5
    • 13.4 Approximate Power-Carrying Capabilities of Long Lines = Ⅰ-13-6
    • 13.5 Modernistic Structures Supporting Two 345-kV Lines = Ⅰ-13-6
    • 13.6 Chicago Area Substation and 138-kV Transmission Line = Ⅰ-13-6
    • 13.7 Resistance Losses Per 100 Circuit Miles of Transmission = Ⅰ-13-8
    • 13.8 Cost of Electric Energy Transmission for 200 Miles = Ⅰ-13-9
    • 13.9 Use of Helicopter in Line Construction = Ⅰ-13-10
    • 13.10 High-Speed Air-Blast Circuit Breakers = Ⅰ-13-10
    • 13.11 765 / 345-kV Single-Pliase, 500 MVA, Forced Oil, Air-Cooled Transformer = Ⅰ-13-10
    • 13.12 Modern Control Center of PJM Power Pool = Ⅰ-13-12
    • 13.13 Towers on the 400 kV de Line showing relatively light construction = Ⅰ-13-15
    • 13.14 Sylmar AC-DC Converter Station = Ⅰ-13-16
    • 13.15 Transmission Cost, 1,000 MW-70% Load Factor = Ⅰ-13-16
    • 13.16 Splicing a 345-kV Underground Cable = Ⅰ-13-18
    • 13.17 Microwave Communication Station = Ⅰ-13-18
    • CHAPTER 14 : DISTRIBUTION SYSTEMS
    • Introduction = Ⅰ-14-1
    • General Considerations = Ⅰ-14-1
    • Distribution System Loads = Ⅰ-14-1
    • Load Densities = Ⅰ-14-2
    • Design of Facilities = Ⅰ-14-2
    • Quality of Service = Ⅰ-14-2
    • Reliability = Ⅰ-14-2
    • Voltage Control = Ⅰ-14-3
    • Voltage Control Methods = Ⅰ-14-4
    • Methods for Improving Service = Ⅰ-14-4
    • Quality of Underground Service = Ⅰ-14-4
    • Distribution Economics = Ⅰ-14-4
    • Distribution Costs and Cost Trends = Ⅰ-14-5
    • Factors Tending to Reduce Costs = Ⅰ-14-5
    • Factors Tending to Increase Costs = Ⅰ-14-5
    • Effect of Undergrounding on Distribution Investment = Ⅰ-14-6
    • TABLES
    • 14.1 Energy Sales Per New Residential Customer = Ⅰ-14-2
    • 14.2 Average Ratios of Underground to Overhead Costs for Extensions = Ⅰ-14-6
    • 14.3 Effect of Increased Undergrounding of Extensions on Investment = Ⅰ-14-7
    • 14.4 Average Ratios of New Underground Cost to Original Overhead Cost for Distribution Line Conversions = Ⅰ-14-8
    • FIGURES
    • 14.1 Maintenance with Truck Mounted Equipment = Ⅰ-14-3
    • 14.2 Installation with Truck Mounted Equipment = Ⅰ-14-4
    • 14.3 Cable Plow = Ⅰ-14-6
    • 14.4 Installation of Underground Distribution Lines = Ⅰ-14-8
    • CHAPTER 15 : UTILITY PRACTICES AFFECTING RELIABILITY OF SIJPPLY
    • Introduction = Ⅰ-15-1
    • System Planning and Operation = Ⅰ-15-1
    • Contingency Tests = Ⅰ-15-1
    • Long-Range Planning Studies = Ⅰ-15-2
    • Lead Time for New Generating Units = Ⅰ-15-3
    • Lead Time for New EHV Transmission Lines = Ⅰ-15-3
    • Communication Facilities = Ⅰ-15-4
    • Attended or Remotely Controlled Substations = Ⅰ-15-4
    • Emergency Power Sources for Control Centers = Ⅰ-15-4
    • Automatic Load Shedding = Ⅰ-15-4
    • Interruptible Loads = Ⅰ-15-6
    • Voltage Reductions = Ⅰ-15-6
    • Reserve Practices = Ⅰ-15-7
    • Generation = Ⅰ-15-7
    • Planned Separation of Generators in System Emergencies = Ⅰ-15-8
    • Turbine Generator Maintenance Practices = Ⅰ-15-9
    • Bulk Power Transmission = Ⅰ-15-10
    • Maintenance Schedules for Transmission Facilities = Ⅰ-15-10
    • Maintenance Timing = Ⅰ-15-12
    • TABLES
    • 15.1 Selected 1968 System Data = Ⅰ-15-1
    • 15.2 Contingency Tests = Ⅰ-15-2
    • 15.3 Long-Range Planning Studies = Ⅰ-15-3
    • 15.4 Attended or Remotely Controlled Bulk Power System Substations = Ⅰ-15-4
    • 15.5 Automatic Load Shedding = Ⅰ-15-5
    • 15.6 Interruptible Loads = Ⅰ-15-6
    • 15.7 Voltage Reductions = Ⅰ-15-7
    • 15.8 Safe Shutdown and Isolation Arrangements for Steam-Electric Plants, 1969 = Ⅰ-15-8
    • 15.9 Emergency Startup Power for Steam-Electric Plants, 1969 = Ⅰ-15-9
    • 15.10 Generator Separation Plan = Ⅰ-15-9
    • 15.11 Turbine-Generator Maintenance Schedules = Ⅰ-15-11
    • 15.12 Transmission System Maintenance = Ⅰ-15-11
    • 15.13 Unavailable Capacity at Time of 1968 System Peak = Ⅰ-15-12
    • FIGURES
    • 15.1 Data Processing Center = Ⅰ-15-2
    • 15.2 Control Room for Steam-Electric Plant = Ⅰ-15-9
    • 15.3 Turbine Undergoing Inspection = Ⅰ-15-10
    • 15.4 Aircraft Patrolling a 500-kV Transmission Line = Ⅰ-15-11
    • CHAPTER 16 : PROBLEMS IN TIMELY PLANNING AND CONSTRUCTION OF NEW FACILITIES
    • Introduction = Ⅰ-16-1
    • elayg in Generating Equipment = Ⅰ-16-1
    • clays in Transmission Construction ) = Ⅰ-16-3
    • Financing Problems = Ⅰ-16-4
    • Scheduling Problems Related to Load Projecting = Ⅰ-16-5
    • Construction Clearances = Ⅰ-16-6
    • Problems During Construction = Ⅰ-16-8
    • Delays following Completion of Constrti Page = Ⅰ-16-9
    • Considerations for Future Planning = Ⅰ-16-9
    • TABLES
    • 16.1 Summary of Capacity Installed and Capacity Delayed = Ⅰ-16-2
    • 16.2 Reported Delays in Schedules of Steam-Electric Generating Units, 300 Megawatts and Larger = Ⅰ-16-3
    • 16.3 Circuit Miles of High Voltage Transmission Line Experiencing Construction Slippage as of June 30, 1970-By Extent of Delay = Ⅰ-16-4
    • 16.4 Circuit Miles of High Voltage Transmission Line Experiencing Construction Slippage as of June 30, 1970-By Cause of Delay = Ⅰ-16-5
    • CHAPTER 17 : COORDINATION FOR RELIABILITY AND ECONOMY
    • Introduction = Ⅰ-17-1
    • Coordinating Organizations = Ⅰ-17-2
    • Formal Coordinating Organizations or Power Pools = Ⅰ-17-2
    • Organizational Structures = Ⅰ-17-4
    • Responsibilities of Pool Membership = Ⅰ-17-4
    • Sharing Reserve Capacity Requirements = Ⅰ-17-4
    • Coordination of Operations = Ⅰ-17-7
    • Coordination of Planning = Ⅰ-17-9
    • Informal Coordinating Organizations or Power Pools = Ⅰ-17-9
    • Planning Organizations = Ⅰ-17-9
    • Other Informal Coordinating Groups = Ⅰ-17-14
    • Electric Reliability Councils = Ⅰ-17-14
    • Strengthened Reliability Councils = Ⅰ-17-15
    • Statement of Policy-Docket No. R-362 = Ⅰ-17-17
    • North American Power Systems Interconnection Committee = Ⅰ-17-21
    • Purpose and Scope = Ⅰ-17-21
    • Organizational Structure = Ⅰ-17-22
    • Liaison With Electric Reliability Councils = Ⅰ-17-22
    • Coordinating Techniques = Ⅰ-17-22
    • Staggered Construction of Generating Capacity = Ⅰ-17-23
    • Seasonal Capacity Exchanges = Ⅰ-17-23
    • joint Enterprises = Ⅰ-17-23
    • joint Enterprises by Formal Power Pools = Ⅰ-17-25
    • The PJM Power Pool = Ⅰ-17-25
    • CAPCO Power Pool = Ⅰ-17-26
    • New England Power Pool = Ⅰ-17-26
    • Small Systems = Ⅰ-17-27
    • Power Supply Sources = Ⅰ-17-27
    • Isolated Systems = Ⅰ-17-27
    • Interconnected Systems = Ⅰ-17-29
    • Small-Scale Power Pooling = Ⅰ-17-29
    • Potential Benefits of Full Coordination = Ⅰ-17-29
    • Trend to Larger Coordinating Groups = Ⅰ-17-30
    • Prospects For Increased Coordination = Ⅰ-17-30
    • Northeast Region = Ⅰ-17-31
    • Southeast Region = Ⅰ-I7-31
    • East Central Region = Ⅰ-17-32
    • West Central Region = Ⅰ-17-32
    • South Central Region = Ⅰ-17-33
    • West Region = Ⅰ-17-34
    • TABLES
    • 17.1 Generating Capacity and Peak Loads of Formal Coordinating Organizations or Power Pools = Ⅰ-17-3
    • 17.2 Members of Formal Coordinating Organizations or Power Pools, January 1, 1970 = Ⅰ-17-5
    • 17.3 Informal Coordinating Organizations or Power Pools, January 1, 1970 = Ⅰ-17-11
    • 17.4 Multiple Memberships in Informal Coordinating Organizations or Power Pools = Ⅰ-17-13
    • 17.5 Organizations Comprising the National Electric Reliability Council = Ⅰ-17-17
    • 17.6 Individual Members of Regional Reliability Councils = Ⅰ-17-18
    • 17.7 Isolated Systems = Ⅰ-17-28
    • FIGURES
    • 17.1 Formal Coordinating Organizations or Power Pools = Ⅰ-17-8
    • 17.2 Informal Coordinating Organizations or Power Pools = Ⅰ-17-10
    • 17.3 National Electric Reliability Council Regions = Ⅰ-17-I6
    • 17.4 North American Power Systems Interconnection Committee = Ⅰ-17-21
    • CHAPTER 18 : POSSIBLE PATTERNS OF GENERATION AND TRANSMISSION THROUGH 1990
    • Introduction = Ⅰ-18-1
    • Possible Patterns of Generation to 1990 = Ⅰ-18-1
    • Total Generating Capacity = Ⅰ-18-1
    • Generation by Type of Capacity = Ⅰ-18-6
    • Reserve Generating Capacity = Ⅰ-18-8
    • Methods of Determining Reserve Requirements = Ⅰ-18-8
    • Reliability of Calculations = Ⅰ-18-8
    • Regional Reserve Requirements = Ⅰ-18-9
    • Reserves for Forced Outages = Ⅰ-18-9
    • Reserves for Load Growth Uncertainties = Ⅰ-18-9
    • Reserves for On-Peak Maintenance = Ⅰ-18-9
    • Total Required Reserve Capacities = Ⅰ-18-10
    • Possible Patterns of Transmission to 1990 = Ⅰ-18-10
    • Primary Transmission Facilities = Ⅰ-18-10
    • Northeast Region = Ⅰ-18-12
    • East Central Region = Ⅰ-18-16
    • Southeast Region = Ⅰ-18-17
    • South Central Region = Ⅰ-I8-18
    • West Central Region = Ⅰ-18-18
    • West Region = Ⅰ-18-19
    • Seasonal Diversity of Peak Demands = Ⅰ-18-20
    • Possible Patterns of Power Supply by Regions = Ⅰ-18-21
    • TABLES
    • 18.1 Generating Capacity by Types of Prime Mover, Peak Demands and Reserves = Ⅰ-18-2
    • 18.2 1970 Generating Capacity by Dates of Installation and Types of Prime Mover = Ⅰ-18 3
    • 18.3 New Capacity Needs by Type of Prime Mover = Ⅰ-18-3
    • 18.4 Maximum Size of Generating Units Anticipated by Regional Advisory Com-mittees = Ⅰ-18-3
    • 18.5 Fossil-Fueled Steam-Electric Capacity by Unit Sizes = Ⅰ-18-6
    • 18.6 Nuclear Capacity by Unit Sizes, 1980 and 1990 = Ⅰ-18-6
    • 18.7 New Generating Plant Sites Required by Tyles of Plant, 1971 to 1990 = Ⅰ-18-7
    • 18.8 U. S. Generation by Type of Capacity, 1970, 1980, and 1990 = Ⅰ-18-7
    • 18.9 Estimated Scheduled Maintenance Requirements by Unit Size = Ⅰ-18-10
    • 18.10 Circuit Miles of Overhead Transmission Lines = Ⅰ-18-11
    • 18.11 Estimated Differences Between August and December Peak Loads by Regions-1970, 1980, and 1990 = Ⅰ-18-21
    • 18.12 Generating Capacity by Regions and Type of Prime Mover ; Peak Demands and Reserve Capacity by Regions = Ⅰ-18-23
    • 18.13 New Capacity Needs by Regions and Type of Prime Mover = Ⅰ-18-25
    • 18.14 Steam-Electric Capacity by Unit Sizes-1980 and 1990 = Ⅰ-18-26
    • 18.15 Estimated Generation by Regions and Type of Capacity-1970, 1980, and 1990 = Ⅰ-18-28
    • FIGURES
    • 18.1 Major Electric Load Centers, 1970-1990 = Ⅰ-18-4
    • 18.2 Generating Centers, 1970 = Ⅰ-18-4
    • 18.3 Generating Centers, 1980 = Ⅰ-18-5
    • 18.4 Generating Centers, 1990 = Ⅰ-18-5
    • 18.5 Stringing Conductor Bundles for a 765-kV Transmission Line = Ⅰ-18-12
    • 18.6 Possible Pattern of Transmission Development, 1990 = Ⅰ-18-14
    • 18.7 Verrnont-Yankee Nuclear Power Plant = Ⅰ-18-13
    • 18.8 Michigan Electric Power Pool Control Center = Ⅰ-18-17
    • 18.9 Control Center of Seattle City Light = Ⅰ-18-20
    • 18.10 Estimated Differences Between August and December Peak Loads by Regions- 1970 and 1990 = Ⅰ-18-22
    • CHAPTER 19 : OUTLOOK FOR ELECTRIC POWER COSTS
    • Introduction = Ⅰ-19-1
    • Past Price and Rate Trends = Ⅰ-19-2
    • Investment in Power Facilities-1990 = Ⅰ-19-3
    • Generation = Ⅰ-19-3
    • Transmission = Ⅰ-19-3
    • Distribution = Ⅰ-19-4
    • Nuclear Fuels Inventory = Ⅰ-19-4
    • General Plant = Ⅰ-19-5
    • Total Investment = Ⅰ-19-5
    • Annual Fixed Charges = Ⅰ-19-5
    • Fuel Cost II = Ⅰ-19-6
    • Operation and Maintenance Costs = Ⅰ-19-7
    • Administrative and General Expenses = Ⅰ-19-8
    • Working Capital = Ⅰ-19-9
    • Total Power Costs = Ⅰ-19-9
    • TABLES
    • 19.1 Component Costs of Power Supply = 1-19-2
    • 19.2 Cost of Electricity to Ultimate Consumers = Ⅰ-19-2
    • 19.3 Estimated Average Investment Cost for New Generating Capacity, 1969-90 = Ⅰ-19-4
    • 19.4 Total Investment in Electric Plants by Region1968 and 1990 = Ⅰ-19-5
    • 19.5 Example of Derivation of Fixed Charge Rate = Ⅰ-19-6
    • 19.6 Estimated 1990 Composite Annual Fixed Charge Rates = Ⅰ-19-6
    • 19.7 Fossil Fuel Cost1968 and 1990 = Ⅰ-19-7
    • 19.8 Fuel Costs by Types of Generation-1968 and 1990 = Ⅰ-19-8
    • 19.9 Operation and Maintenance Costs of Generating Plants-1990 = Ⅰ-19-8
    • 19.10 Annual Cost of Working Capital-I990 = Ⅰ-19-9
    • 19.11 Costs of Electricity by Region1968 and 1990 = Ⅰ-19-10
    • FIGURES
    • 19.1 Price of Electricity to Ultimate Consumers = Ⅰ-19-2
    • 19.2 Regional Power Costs-1968 and 1990 = Ⅰ-19-11
    • CHAPTER 20 : FINANCING THE INDUSTRY'S GROWTH
    • Introduction = Ⅰ-20-1
    • Trend of Capital Outlays = Ⅰ-20-2
    • Sources of Financing for Investor-Owned Systems = Ⅰ-20-2
    • Internal Sources = Ⅰ-20-3
    • Depreciation = Ⅰ-20-4
    • Retained Earnings = Ⅰ-20-5
    • Deferred Taxes = Ⅰ-20-6
    • External Sources = Ⅰ-20-6
    • Sources of Financing-Non-Federal Public Systems = Ⅰ-20-9
    • Sources of Financing-Federal Systems = Ⅰ-20-9
    • Sources of Financing for Cooperative Systems = Ⅰ-20-10
    • Private Financing Through Holding Companies and joint Enterprises = Ⅰ-20-11
    • Outlook for Future Financing = Ⅰ-20-12
    • TABLES
    • 20.1 Electric Utility Industry Capital Expenditures, Contiguous United States = Ⅰ-20-3
    • 20.2 Investor-Owned Electric Utilities Sources of Funds = Ⅰ-20-5
    • 20.3 Investor-owned Electric Utilities Sources of Funds in Percent = Ⅰ-20-6
    • 20.4 Average Rates of Depreciation for Investor-Owned Electric Utilities by Func-tional Plant Classification for Selected Years = Ⅰ-20-7
    • 20.5 Short-Term Borrowing by Private Electric Utilities, 1960-1970 = Ⅰ-20-8
    • 20.6 Long Term Debt as a Proportion of Total Capitalization for 202 Investor-Owned Electric Utilities, December 31, 1970 = Ⅰ-20-9
    • 20.7 Capitalization of Class A and B Investor-Owned Electric Utilities, 1937-1970 = Ⅰ-20-10
    • 20.8 Schedule of Electric Utility Debt Falling due 1971-2005 = Ⅰ-20-13
    • 20.9 Earned Rates of Return and Average Interest Rates, Investor-Owned Electric Utilities, 1946-1970 = Ⅰ-20-13
    • FIGURES
    • 20.1 Annual Capital Expenditures for Electric Plant by Type of Facility = Ⅰ-20-4
    • 20.2 Annual Capital Expenditures for Electric Plant by Ownership Sectors = Ⅰ-20-4
    • 20.3 Sources of FundNon-Federal Public Systems, 1952-1969 = Ⅰ-20-9
    • 20.4 Sources of Funds-Distribution Cooperatives, 1955-1969 = Ⅰ-20-11
    • 20.5 Sources of Funds-G&T Cooperatives, 1955-1969 = Ⅰ-20-11
    • CHAPTER 21 : RESEARCH AND DEVELOPMENT NEEDS OF THE INDUSTRY
    • Introduction = Ⅰ-21-1
    • Distribution = Ⅰ-21-2
    • Transmission = Ⅰ-21-2
    • Underground Cables = Ⅰ-21-2
    • Ultra-High-Voltage ac Systems = Ⅰ-21-5
    • High-Voltage de Transmission = Ⅰ-21-6
    • Environmental and Esthetic Considerations = Ⅰ-21-6
    • Generation = Ⅰ-21-7
    • Plant Siting = Ⅰ-21-7
    • Nuclear Facilities = Ⅰ-21-7
    • The Breeder = Ⅰ-21-8
    • Fossil-Fueled Generation = Ⅰ-21-9
    • Hydroelectric Plants = Ⅰ-21-10
    • Gas Turbines = Ⅰ-21-11
    • Diesel Plants = Ⅰ-21-11
    • Possible New Methods of Power Generation = Ⅰ-21-12
    • Fuels and Fuel Transportation for Power Plants = Ⅰ-21-13
    • Coal = Ⅰ-21-14
    • Oil = Ⅰ-21-14
    • Natural Gas = Ⅰ-21-15
    • Nuclear Fuels = Ⅰ-21-15
    • Environmental Considerations = Ⅰ-21-16
    • Air Pollution = Ⅰ-21-16
    • Particulate Matter = Ⅰ-21-16
    • Sulfur = Ⅰ-21-16
    • Nitrogen Oxides = Ⅰ-21-16
    • Radioactive Releases = Ⅰ-21-17
    • General = Ⅰ-21-17
    • Water Ecology Studies = Ⅰ-21-17
    • Cooling Water Systems = Ⅰ-21-18
    • Power System Reliability = Ⅰ-21-19
    • Research and Development Priorities = Ⅰ-21-20
    • Meeting the Research and Development Requirements of the Future = Ⅰ-21-20
    • Institutional Framework = Ⅰ-21-20
    • Scope of lndustry-Sponsored Research and Development = Ⅰ-21-21
    • Financing = Ⅰ-21-21
    • FIGURES
    • 21.1 Waltz Mill Cable Test Station = Ⅰ-21-3
    • 21.2 Experimental Underground Cable Utilizing Tubular Conductors Cooled by Liquid Nitrogen = Ⅰ-21-4
    • 21.3 Project UHV Facility = Ⅰ-21-5
    • 21.4 New Design of a 230-kV Transmission Tower = Ⅰ-21-6
    • 21.5 Southwest Experimental Fast Oxide Reactor = Ⅰ-21-9
    • 21.6 Experiment in Confining Deuterium Gas = Ⅰ-21-13
    • SUPPLEMENT
    • Managing the Power Supply and the Environment
    • A Report to the Federal Power Commission by the Task Force on Environment = Ⅰ-22-1
    • APPENDICES
    • Acknowledgments = Ⅰ-23-1
    • Glossary of Abbreviations and Definitions = Ⅰ-24-1
    • Subject Index = Ⅰ-25-1
    • ADVISORY REPORTS TO THE FEDERAL POWER COMMISSION IN SEPARATE VOLUMES
    • Part Ⅱ
    • The Northeast Regional Advisory Committee = Ⅰ-23-2
    • The East Central Regional Advisory Committee = Ⅰ-23-3
    • The Southeast Regional Advisory Committee = Ⅰ-23-3
    • The Fossil Fuel Resources Committee = Ⅰ-24-3
    • Part Ⅲ
    • The South Central Regional Advisory Committee = Ⅰ-23-4
    • The West Central Regional Advisory Committee = Ⅰ-23-3
    • The West Regional Advisory Committee = Ⅰ-23-4
    • Part Ⅳ
    • The Generation Technical Advisory Committee = Ⅰ-23-5
    • The Transmission Technical Advisory Committee = Ⅰ-23-5
    • The Distribution Technical Advisory Committee = Ⅰ-23-5
    • The Technical Advisory Committee on Load Forecasting Methodology = Ⅰ-23-5
    • [Volume. 1970(2)]----------
    • CONTENTS
    • PART Ⅱ
    • Electric Power in the Northeast 1970-1980-1990
    • Summary = Ⅱ-1-ⅸ
    • Chapter Ⅰ. Estimated Future Power Requirements = Ⅱ-1-1
    • Chapter Ⅱ. Fuels = Ⅱ-1-17
    • Chapter Ⅲ. Electric Generating Facility Trends in the Northeast, 1970-1990 = Ⅱ-1-30
    • Chapter Ⅳ. Changing Technical, Economic and Environmental Factors = Ⅱ-1-47
    • Chapter Ⅴ. Generation Reserve Requirements = Ⅱ-1-52
    • Chapter Ⅵ. Economics of Base Load Generating Plant Selection = Ⅱ-1-59
    • Chapter Ⅶ. Pattern of Bulk Power Transmission in the Northeast = Ⅱ-1-62
    • Chapter Ⅷ. Coordinated Planning, Operation, and Development = Ⅱ-1-69
    • Chapter Ⅸ. Generation and Transmission Patterns for 1980 and 1990 = Ⅱ-1-91
    • Electric Power in the East Central Region 1970-1980-1990
    • Summary = Ⅱ-2-ⅸ
    • Chapter Ⅰ. General Description of the East Central Region. = Ⅱ-2-1
    • Chapter Ⅱ. Future Power Requirements = Ⅱ-2-4
    • Chapter Ⅲ. Fuels = Ⅱ-2-21
    • Chapter Ⅳ. Sources of Power Supply = Ⅱ-2-30
    • Chapter Ⅴ. Transmission and Interconnection = Ⅱ-2-37
    • Chapter Ⅵ. Generation Reserves = Ⅱ-2-40
    • Chapter Ⅶ. Coordinated Planning and Development = Ⅱ-2-45
    • Chapter Ⅷ. Reliability = Ⅱ-2-57
    • Chapter Ⅸ. Environmental Considerations = Ⅱ-2-60
    • Chapter Ⅹ. Patterns of Generation and Transmission = Ⅱ-2-66
    • Electric Power in the Southeast 1970-1980-1990
    • Summary = Ⅱ-3-ⅶ
    • Chapter Ⅰ. Structure of the Industry = Ⅱ-3-1
    • Chapter Ⅱ. Estimated Future Power Requirements = Ⅱ-3-5
    • Chapter Ⅲ. Patterns of Generation and Transmission = Ⅱ-3-21
    • Chapter Ⅳ. Statement of Coordination = Ⅱ-3-32
    • Chapter Ⅴ. Appraisal of Undeveloped Hydroelectric Potential in the Southeast = Ⅱ-3-36
    • Chapter Ⅵ. Fuels = Ⅱ-3-44
    • Fuel Resources, Requirements and Costs for Electric Generation in Eastern United States
    • Chapter Ⅰ. Introduction = Ⅱ-4-1
    • Chapter Ⅱ. Summary and Conclusions = Ⅱ-4-2
    • Chapter Ⅲ. Electric Energy Requirements = Ⅱ-4-4
    • Cbapter IV. Coal = Ⅱ-4-6
    • Chapter Ⅴ. Natural Gas = Ⅰl-4-14
    • Chapter Ⅵ. Residual Oil = Ⅱ-4-17
    • Chapter Ⅶ. Nuclear Fuel = Ⅱ-4-20
    • Chapter Ⅷ. Effect of Air Pollution Control on Fuel Availability and Cost = Ⅱ-4-23
    • [Volume. 1970(3)]----------
    • CONTENTS
    • PART Ⅲ
    • Electric Power in the South Central Region-1970-1980-1990
    • Introduction = Ⅲ-1-ⅶ
    • Summary = Ⅲ-1-ⅷ
    • Chapter 1. Forecast of Power Requirements for the South Central Region-1970-1990. = Ⅲ-1-1
    • Chapter 2. Fuels Resources = Ⅲ-1-8
    • Chapter 3. Reconunendations for Coordinated Planning and Development = Ⅲ-1-16
    • Chapter 4. General Patterns of Generation and Transmission-1970-1990 = Ⅲ-1-25
    • Appendices = Ⅲ-1-91
    • West Central Region Power Survey-1970-1990
    • Summary = Ⅲ-2-ⅶ
    • Chapter 1. Load and Energy Projections = Ⅲ-2-1
    • Chapter 2. Inventory of Fossil Fuel Resources = Ⅲ-2-14
    • Chapter 3. General Patterns of Generation and Transmission = Ⅲ-2-44
    • Chapter 4. Coordinated Planning and Development = Ⅲ-2-59
    • Chapter 5. Maps of Possible Transmission Patterns = Ⅲ-2-96
    • The Future of Power in the West Region
    • Introduction and General Summary = Ⅲ-3-1
    • Chapter 1. Power Requirements = Ⅲ-3-15
    • Chapter 2. Energy Supply and Demand = Ⅲ-3-44
    • Chapter 3. Generation = Ⅲ-3-120
    • Chapter 4. Transmission = Ⅲ-3-170
    • Chapter 5. Coordinated Planning and Development = Ⅲ-3-189
    더보기

    분석정보

    View

    상세정보조회

    0

    usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

      더보기

      서지정보 내보내기(Export)

      닫기

      내보내기 형태를 선택하세요

      서지정보의 형식을 선택하세요

      참고문헌양식 참고문헌양식안내

      내책장담기

      닫기

      필수표가 있는 항목은 반드시 기재해 주셔야 합니다.

      동일자료를 같은 책장에 담을 경우 담은 시점만 최신으로 수정됩니다.

      새책장 만들기

      닫기

      필수표가 있는 항목은 반드시 기재해 주셔야 합니다.

      • 책장설명은 [내 책장/책장목록]에서 수정할 수 있습니다.

      • 책장카테고리 설정은 최소1개 ~ 최대3개까지 가능합니다.

      관심분야 검색

      닫기

      트리 또는 검색을 통해 관심분야를 선택 하신 후 등록 버튼을 클릭 하십시오.

        관심분야 검색 결과
        대분류 중분류 관심분야명
        검색결과가 없습니다.

        선택된 분야 (선택분야는 최소 하나 이상 선택 하셔야 합니다.)

        소장기관 정보

        닫기

        문헌복사 및 대출서비스 정책은 제공도서관 규정에 따라 상이할수 있음

        권호소장정보

        닫기

          오류접수

          닫기
          오류접수

          [ 논문 정보 ]

            [ 신청자 정보 ]

            •   -     -  
            • ※ 개인정보 노출 방지를 위해 민감한 개인정보 내용은 가급적 기재를 자제하여 주시기 바랍니다.
              (상담을 위해 불가피하게 개인정보를 기재하셔야 한다면, 가능한 최소한의 개인정보를 기재하여 주시기 바랍니다.)

            • 작성하신 내용을 완료하시려면 [보내기] 버튼을, 수정하시려면 [수정]버튼을 눌러주세요.

            오류 접수 확인

            닫기
            오류 접수 확인
            • 고객님, 오류접수가 정상적으로 신청 되었습니다.

              문의하신 내용은 3시간 이내에 메일로 답변을 드릴 수 있도록 하겠습니다.

              다만, 고객센터 운영시간(평일 09:00 ~ 18:00) 이외에는

              처리가 다소 지연될 수 있으니 이 점 양해 부탁 드립니다.

              로그인 후, 문의하신 내용은 나의상담내역에서 조회하실 수 있습니다.

            [접수 정보]

            음성서비스 신청

            닫기
            음성서비스 신청

            [ 논문 정보 ]

              [ 신청자 정보 ]

              •   -     -  
              • 작성하신 내용을 완료하시려면 [신청] 버튼을, 수정하시려면 [수정]버튼을 눌러주세요.

              음성서비스 신청 확인

              닫기
              음성서비스 신청 확인
              • 서비스 신청이 완료되었습니다.

                신청하신 내역에 대한 처리 완료 시 메일로 별도 안내 드리도록 하겠습니다.

                음성서비스 신청 증가 등의 이유로 처리가 다소 지연될 수 있으니, 이 점 양해 부탁드립니다.

                감합니다.

              [신청 정보]

              41061 대구광역시 동구 동내로 64(동내동1119) KERIS빌딩

              고객센터 (평일: 09:00 ~ 18:00)1599-3122

              Copyright© KERIS. ALL RIGHTS RESERVED

              PC 버전 바로가기

              이용약관

              닫기

              학술연구정보서비스 이용약관 (2017년 1월 1일 ~ 현재 적용)

              1. 제 1 장 총칙

                1. 제 1 조 (목적)

                  • 이 약관은 한국교육학술정보원(이하 "교육정보원"라 함)이 제공하는 학술연구정보서비스의 웹사이트(이하 "서비스" 라함)의 이용에 관한 조건 및 절차와 기타 필요한 사항을 규정하는 것을 목적으로 합니다.
                2. 제 2 조 (약관의 효력과 변경)

                  1. ① 이 약관은 서비스 메뉴에 게시하여 공시함으로써 효력을 발생합니다.
                  2. ② 교육정보원은 합리적 사유가 발생한 경우에는 이 약관을 변경할 수 있으며, 약관을 변경한 경우에는 지체없이 "공지사항"을 통해 공시합니다.
                  3. ③ 이용자는 변경된 약관사항에 동의하지 않으면, 언제나 서비스 이용을 중단하고 이용계약을 해지할 수 있습니다.
                3. 제 3 조 (약관외 준칙)

                  • 이 약관에 명시되지 않은 사항은 관계 법령에 규정 되어있을 경우 그 규정에 따르며, 그렇지 않은 경우에는 일반적인 관례에 따릅니다.
                4. 제 4 조 (용어의 정의)

                  이 약관에서 사용하는 용어의 정의는 다음과 같습니다.
                  1. ① 이용자 : 교육정보원과 이용계약을 체결한 자
                  2. ② 이용자번호(ID) : 이용자 식별과 이용자의 서비스 이용을 위하여 이용계약 체결시 이용자의 선택에 의하여 교육정보원이 부여하는 문자와 숫자의 조합
                  3. ③ 비밀번호 : 이용자 자신의 비밀을 보호하기 위하여 이용자 자신이 설정한 문자와 숫자의 조합
                  4. ④ 단말기 : 서비스 제공을 받기 위해 이용자가 설치한 개인용 컴퓨터 및 모뎀 등의 기기
                  5. ⑤ 서비스 이용 : 이용자가 단말기를 이용하여 교육정보원의 주전산기에 접속하여 교육정보원이 제공하는 정보를 이용하는 것
                  6. ⑥ 이용계약 : 서비스를 제공받기 위하여 이 약관으로 교육정보원과 이용자간의 체결하는 계약을 말함
                  7. ⑦ 마일리지 : RISS 서비스 중 마일리지 적립 가능한 서비스를 이용한 이용자에게 지급되며, RISS가 제공하는 특정 디지털 콘텐츠를 구입하는 데 사용하도록 만들어진 포인트
              2. 제 2 장 서비스 이용 계약

                1. 제 5 조 (이용계약의 성립)

                  1. ① 이용계약은 이용자의 이용신청에 대한 교육정보원의 이용 승낙에 의하여 성립됩니다.
                  2. ② 제 1항의 규정에 의해 이용자가 이용 신청을 할 때에는 교육정보원이 이용자 관리시 필요로 하는
                    사항을 전자적방식(교육정보원의 컴퓨터 등 정보처리 장치에 접속하여 데이터를 입력하는 것을 말합니다)
                    이나 서면으로 하여야 합니다.
                  3. ③ 이용계약은 이용자번호 단위로 체결하며, 체결단위는 1 이용자번호 이상이어야 합니다.
                  4. ④ 서비스의 대량이용 등 특별한 서비스 이용에 관한 계약은 별도의 계약으로 합니다.
                2. 제 6 조 (이용신청)

                  1. ① 서비스를 이용하고자 하는 자는 교육정보원이 지정한 양식에 따라 온라인신청을 이용하여 가입 신청을 해야 합니다.
                  2. ② 이용신청자가 14세 미만인자일 경우에는 친권자(부모, 법정대리인 등)의 동의를 얻어 이용신청을 하여야 합니다.
                3. 제 7 조 (이용계약 승낙의 유보)

                  1. ① 교육정보원은 다음 각 호에 해당하는 경우에는 이용계약의 승낙을 유보할 수 있습니다.
                    1. 1. 설비에 여유가 없는 경우
                    2. 2. 기술상에 지장이 있는 경우
                    3. 3. 이용계약을 신청한 사람이 14세 미만인 자로 친권자의 동의를 득하지 않았을 경우
                    4. 4. 기타 교육정보원이 서비스의 효율적인 운영 등을 위하여 필요하다고 인정되는 경우
                  2. ② 교육정보원은 다음 각 호에 해당하는 이용계약 신청에 대하여는 이를 거절할 수 있습니다.
                    1. 1. 다른 사람의 명의를 사용하여 이용신청을 하였을 때
                    2. 2. 이용계약 신청서의 내용을 허위로 기재하였을 때
                4. 제 8 조 (계약사항의 변경)

                  이용자는 다음 사항을 변경하고자 하는 경우 서비스에 접속하여 서비스 내의 기능을 이용하여 변경할 수 있습니다.
                  1. ① 성명 및 생년월일, 신분, 이메일
                  2. ② 비밀번호
                  3. ③ 자료신청 / 기관회원서비스 권한설정을 위한 이용자정보
                  4. ④ 전화번호 등 개인 연락처
                  5. ⑤ 기타 교육정보원이 인정하는 경미한 사항
              3. 제 3 장 서비스의 이용

                1. 제 9 조 (서비스 이용시간)

                  • 서비스의 이용 시간은 교육정보원의 업무 및 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간(00:00-24:00)을 원칙으로 합니다. 다만 정기점검등의 필요로 교육정보원이 정한 날이나 시간은 그러하지 아니합니다.
                2. 제 10 조 (이용자번호 등)

                  1. ① 이용자번호 및 비밀번호에 대한 모든 관리책임은 이용자에게 있습니다.
                  2. ② 명백한 사유가 있는 경우를 제외하고는 이용자가 이용자번호를 공유, 양도 또는 변경할 수 없습니다.
                  3. ③ 이용자에게 부여된 이용자번호에 의하여 발생되는 서비스 이용상의 과실 또는 제3자에 의한 부정사용 등에 대한 모든 책임은 이용자에게 있습니다.
                3. 제 11 조 (서비스 이용의 제한 및 이용계약의 해지)

                  1. ① 이용자가 서비스 이용계약을 해지하고자 하는 때에는 온라인으로 교육정보원에 해지신청을 하여야 합니다.
                  2. ② 교육정보원은 이용자가 다음 각 호에 해당하는 경우 사전통지 없이 이용계약을 해지하거나 전부 또는 일부의 서비스 제공을 중지할 수 있습니다.
                    1. 1. 타인의 이용자번호를 사용한 경우
                    2. 2. 다량의 정보를 전송하여 서비스의 안정적 운영을 방해하는 경우
                    3. 3. 수신자의 의사에 반하는 광고성 정보, 전자우편을 전송하는 경우
                    4. 4. 정보통신설비의 오작동이나 정보 등의 파괴를 유발하는 컴퓨터 바이러스 프로그램등을 유포하는 경우
                    5. 5. 정보통신윤리위원회로부터의 이용제한 요구 대상인 경우
                    6. 6. 선거관리위원회의 유권해석 상의 불법선거운동을 하는 경우
                    7. 7. 서비스를 이용하여 얻은 정보를 교육정보원의 동의 없이 상업적으로 이용하는 경우
                    8. 8. 비실명 이용자번호로 가입되어 있는 경우
                    9. 9. 일정기간 이상 서비스에 로그인하지 않거나 개인정보 수집․이용에 대한 재동의를 하지 않은 경우
                  3. ③ 전항의 규정에 의하여 이용자의 이용을 제한하는 경우와 제한의 종류 및 기간 등 구체적인 기준은 교육정보원의 공지, 서비스 이용안내, 개인정보처리방침 등에서 별도로 정하는 바에 의합니다.
                  4. ④ 해지 처리된 이용자의 정보는 법령의 규정에 의하여 보존할 필요성이 있는 경우를 제외하고 지체 없이 파기합니다.
                  5. ⑤ 해지 처리된 이용자번호의 경우, 재사용이 불가능합니다.
                4. 제 12 조 (이용자 게시물의 삭제 및 서비스 이용 제한)

                  1. ① 교육정보원은 서비스용 설비의 용량에 여유가 없다고 판단되는 경우 필요에 따라 이용자가 게재 또는 등록한 내용물을 삭제할 수 있습니다.
                  2. ② 교육정보원은 서비스용 설비의 용량에 여유가 없다고 판단되는 경우 이용자의 서비스 이용을 부분적으로 제한할 수 있습니다.
                  3. ③ 제 1 항 및 제 2 항의 경우에는 당해 사항을 사전에 온라인을 통해서 공지합니다.
                  4. ④ 교육정보원은 이용자가 게재 또는 등록하는 서비스내의 내용물이 다음 각호에 해당한다고 판단되는 경우에 이용자에게 사전 통지 없이 삭제할 수 있습니다.
                    1. 1. 다른 이용자 또는 제 3자를 비방하거나 중상모략으로 명예를 손상시키는 경우
                    2. 2. 공공질서 및 미풍양속에 위반되는 내용의 정보, 문장, 도형 등을 유포하는 경우
                    3. 3. 반국가적, 반사회적, 범죄적 행위와 결부된다고 판단되는 경우
                    4. 4. 다른 이용자 또는 제3자의 저작권 등 기타 권리를 침해하는 경우
                    5. 5. 게시 기간이 규정된 기간을 초과한 경우
                    6. 6. 이용자의 조작 미숙이나 광고목적으로 동일한 내용의 게시물을 10회 이상 반복하여 등록하였을 경우
                    7. 7. 기타 관계 법령에 위배된다고 판단되는 경우
                5. 제 13 조 (서비스 제공의 중지 및 제한)

                  1. ① 교육정보원은 다음 각 호에 해당하는 경우 서비스 제공을 중지할 수 있습니다.
                    1. 1. 서비스용 설비의 보수 또는 공사로 인한 부득이한 경우
                    2. 2. 전기통신사업법에 규정된 기간통신사업자가 전기통신 서비스를 중지했을 때
                  2. ② 교육정보원은 국가비상사태, 서비스 설비의 장애 또는 서비스 이용의 폭주 등으로 서비스 이용에 지장이 있는 때에는 서비스 제공을 중지하거나 제한할 수 있습니다.
                6. 제 14 조 (교육정보원의 의무)

                  1. ① 교육정보원은 교육정보원에 설치된 서비스용 설비를 지속적이고 안정적인 서비스 제공에 적합하도록 유지하여야 하며 서비스용 설비에 장애가 발생하거나 또는 그 설비가 못쓰게 된 경우 그 설비를 수리하거나 복구합니다.
                  2. ② 교육정보원은 서비스 내용의 변경 또는 추가사항이 있는 경우 그 사항을 온라인을 통해 서비스 화면에 공지합니다.
                7. 제 15 조 (개인정보보호)

                  1. ① 교육정보원은 공공기관의 개인정보보호에 관한 법률, 정보통신이용촉진등에 관한 법률 등 관계법령에 따라 이용신청시 제공받는 이용자의 개인정보 및 서비스 이용중 생성되는 개인정보를 보호하여야 합니다.
                  2. ② 교육정보원의 개인정보보호에 관한 관리책임자는 학술연구정보서비스 이용자 관리담당 부서장(학술정보본부)이며, 주소 및 연락처는 대구광역시 동구 동내로 64(동내동 1119) KERIS빌딩, 전화번호 054-714-0114번, 전자메일 privacy@keris.or.kr 입니다. 개인정보 관리책임자의 성명은 별도로 공지하거나 서비스 안내에 게시합니다.
                  3. ③ 교육정보원은 개인정보를 이용고객의 별도의 동의 없이 제3자에게 제공하지 않습니다. 다만, 다음 각 호의 경우는 이용고객의 별도 동의 없이 제3자에게 이용 고객의 개인정보를 제공할 수 있습니다.
                    1. 1. 수사상의 목적에 따른 수사기관의 서면 요구가 있는 경우에 수사협조의 목적으로 국가 수사 기관에 성명, 주소 등 신상정보를 제공하는 경우
                    2. 2. 신용정보의 이용 및 보호에 관한 법률, 전기통신관련법률 등 법률에 특별한 규정이 있는 경우
                    3. 3. 통계작성, 학술연구 또는 시장조사를 위하여 필요한 경우로서 특정 개인을 식별할 수 없는 형태로 제공하는 경우
                  4. ④ 이용자는 언제나 자신의 개인정보를 열람할 수 있으며, 스스로 오류를 수정할 수 있습니다. 열람 및 수정은 원칙적으로 이용신청과 동일한 방법으로 하며, 자세한 방법은 공지, 이용안내에 정한 바에 따릅니다.
                  5. ⑤ 이용자는 언제나 이용계약을 해지함으로써 개인정보의 수집 및 이용에 대한 동의, 목적 외 사용에 대한 별도 동의, 제3자 제공에 대한 별도 동의를 철회할 수 있습니다. 해지의 방법은 이 약관에서 별도로 규정한 바에 따릅니다.
                8. 제 16 조 (이용자의 의무)

                  1. ① 이용자는 서비스를 이용할 때 다음 각 호의 행위를 하지 않아야 합니다.
                    1. 1. 다른 이용자의 이용자번호를 부정하게 사용하는 행위
                    2. 2. 서비스를 이용하여 얻은 정보를 교육정보원의 사전승낙없이 이용자의 이용이외의 목적으로 복제하거나 이를 출판, 방송 등에 사용하거나 제3자에게 제공하는 행위
                    3. 3. 다른 이용자 또는 제3자를 비방하거나 중상모략으로 명예를 손상하는 행위
                    4. 4. 공공질서 및 미풍양속에 위배되는 내용의 정보, 문장, 도형 등을 타인에게 유포하는 행위
                    5. 5. 반국가적, 반사회적, 범죄적 행위와 결부된다고 판단되는 행위
                    6. 6. 다른 이용자 또는 제3자의 저작권등 기타 권리를 침해하는 행위
                    7. 7. 기타 관계 법령에 위배되는 행위
                  2. ② 이용자는 이 약관에서 규정하는 사항과 서비스 이용안내 또는 주의사항을 준수하여야 합니다.
                  3. ③ 이용자가 설치하는 단말기 등은 전기통신설비의 기술기준에 관한 규칙이 정하는 기준에 적합하여야 하며, 서비스에 장애를 주지 않아야 합니다.
                9. 제 17 조 (광고의 게재)

                  교육정보원은 서비스의 운용과 관련하여 서비스화면, 홈페이지, 전자우편 등에 광고 등을 게재할 수 있습니다.
              4. 제 4 장 서비스 이용 요금

                1. 제 18 조 (이용요금)

                  1. ① 서비스 이용료는 기본적으로 무료로 합니다. 단, 민간업체와의 협약에 의해 RISS를 통해 서비스 되는 콘텐츠의 경우 각 민간 업체의 요금 정책에 따라 유료로 서비스 합니다.
                  2. ② 그 외 교육정보원의 정책에 따라 이용 요금 정책이 변경될 경우에는 온라인으로 서비스 화면에 게시합니다.
              5. 제 5 장 마일리지 정책

                1. 제 19 조 (마일리지 정책의 변경)

                  1. ① RISS 마일리지는 2017년 1월부로 모두 소멸되었습니다.
                  2. ② 교육정보원은 마일리지 적립ㆍ사용ㆍ소멸 등 정책의 변경에 대해 온라인상에 공지해야하며, 최근에 온라인에 등재된 내용이 이전의 모든 규정과 조건보다 우선합니다.
              6. 제 6 장 저작권

                1. 제 20 조 (게재된 자료에 대한 권리)

                  서비스에 게재된 자료에 대한 권리는 다음 각 호와 같습니다.
                  1. ① 게시물에 대한 권리와 책임은 게시자에게 있으며, 교육정보원은 게시자의 동의 없이는 이를 영리적 목적으로 사용할 수 없습니다.
                  2. ② 게시자의 사전 동의가 없이는 이용자는 서비스를 이용하여 얻은 정보를 가공, 판매하는 행위 등 서비스에 게재된 자료를 상업적 목적으로 이용할 수 없습니다.
              7. 제 7 장 이의 신청 및 손해배상 청구 금지

                1. 제 21 조 (이의신청금지)

                  이용자는 교육정보원에서 제공하는 서비스 이용시 발생되는 어떠한 문제에 대해서도 무료 이용 기간 동안은 이의 신청 및 민원을 제기할 수 없습니다.
                2. 제 22 조 (손해배상청구금지)

                  이용자는 교육정보원에서 제공하는 서비스 이용시 발생되는 어떠한 문제에 대해서도 무료 이용 기간 동안은 교육정보원 및 관계 기관에 손해배상 청구를 할 수 없으며 교육정보원은 이에 대해 책임을 지지 아니합니다.
              8. 부칙

                이 약관은 2000년 6월 1일부터 시행합니다.
              9. 부칙(개정 2005. 5. 31)

                이 약관은 2005년 5월 31일부터 시행합니다.
              10. 부칙(개정 2010. 1. 1)

                이 약관은 2010년 1월 1일부터 시행합니다.
              11. 부칙(개정 2010. 4 1)

                이 약관은 2010년 4월 1일부터 시행합니다.
              12. 부칙(개정 2017. 1 1)

                이 약관은 2017년 1월 1일부터 시행합니다.

              학술연구정보서비스 개인정보처리방침

              Ver 8.6 (2023년 1월 31일 ~ )

              닫기

              학술연구정보서비스(이하 RISS)는 정보주체의 자유와 권리 보호를 위해 「개인정보 보호법」 및 관계 법령이 정한 바를 준수하여, 적법하게 개인정보를 처리하고 안전하게 관리하고 있습니다. 이에 「개인정보 보호법」 제30조에 따라 정보주체에게 개인정보 처리에 관한 절차 및 기준을 안내하고, 이와 관련한 고충을 신속하고 원활하게 처리할 수 있도록 하기 위하여 다음과 같이 개인정보 처리방침을 수립·공개합니다.

              처리목적 제1조(개인정보의 처리 목적)
              RISS는 개인정보를 다음의 목적을 위해 처리합니다. 처리하고 있는 개인정보는 다음의 목적 이외의 용도로는 이용되지 않으며, 이용 목적이 변경되는 경우에는 「개인정보 보호법」 제18조에 따라 별도의 동의를 받는 등 필요한 조치를 이행할 예정입니다.
              가. 서비스 제공
                   - 콘텐츠 제공, 문헌배송 및 결제, 요금정산 등 서비스 제공
              나. 회원관리
                   - 회원제 서비스 이용에 따른 본인확인,
                   - 만14세 미만 아동 개인 정보 수집 시 법정 대리인 동의여부 확인, 추후 법정 대리인 본인확인
                   - 분쟁 조정을 위한 기록보존, 불만처리 등을 위한 원활한 의사소통 경로의 확보, 공지사항 전달
              다. 서비스 개선
                   - 신규 서비스 개발 및 특화
                   - 통계학적 특성에 따른 서비스 제공 및 광고 게재, 이벤트 등 정보 전달 및 참여 기회 제공
                   - 서비스 이용에 대한 통계
              보유 기간제2조(개인정보의 처리 및 보유 기간)
              가. 처리기간 및 보유 기간:

              3년

              또는 회원탈퇴시까지
              나. 다만, 다음의 사유에 해당하는 경우에는 해당 사유 종료시 까지 정보를 보유 및 열람합니다.
                   ▶ 신청 중인 서비스가 완료 되지 않은 경우
                        - 보존 이유 : 진행 중인 서비스 완료(예:원문복사 등)
                        - 보존 기간 : 서비스 완료 시까지
                        - 열람 예정 시기 : 수시(RISS에서 신청된 서비스의 처리내역 및 진행상태 확인 요청 시)
                   ▶ 관련법령에 의한 정보보유 사유 및 기간
                        - 대금결제 및 재화 등의 공급에 관한 기록 :

              5년

              (「전자상거래 등에서의 소비자보호에 관한
                         법률」 제 6조 및 시행령 제 6조)
                        - 소비자의 불만 또는 분쟁 처리에 관한 기록 :

              3년

              (「전자상거래 등에서의 소비자보호에 관한
                         법률」 제 6조 및 시행령 제 6조)
                        - 접속에 관한 기록 :

              2년

              이상(개인정보보호위원회 : 개인정보의 안전성 확보조치 기준)
              처리 항목제3조(처리하는 개인정보의 항목)
              가. 필수 항목 : ID, 이름, 생년월일, 신분(직업구분), 이메일, 소속분야,
                   보호자 성명(어린이회원), 보호자 이메일(어린이회원)
              나: 선택 항목 : 소속기관명, 학과/부서명, 학번/직원번호, 전화, 주소, 장애인 여부
              다. 자동수집항목 : IP주소, ID, 서비스 이용기록, 방문기록
              개인 정보제4조(개인정보파일 등록 현황)
              개인정보파일의 명칭 운영근거 / 처리목적 개인정보파일에 기록되는 개인정보의 항목 보유기간
              학술연구정보서비스 이용자 가입정보 파일 한국교육학술정보원법 필수 ID, 비밀번호, 성명, 생년월일, 신분(직업구분), 이메일, 소속분야, 웹진메일 수신동의 여부 3년
              또는
              탈퇴시
              선택 소속기관명, 소속도서관명, 학과/부서명, 학번/직원번호, 휴대전화, 주소
              제3자 제공제5조(개인정보의 제3자 제공)
              가. RISS는 원칙적으로 정보주체의 개인정보를 제1조(개인정보의 처리 목적)에서 명시한 범위 내에서
                   처리하며, 정보주체의 사전 동의 없이는 본래의 범위를 초과하여 처리하거나 제3자에게 제공하지
                   않습니다. 단, 정보주체의 동의, 법률의 특별한 규정 등 개인정보 보호법 제17조 및 제18조에 해당하는
                   경우에만 개인정보를 제3자에게 제공합니다.
              나. RISS는 원활한 서비스 제공을 위해 다음의 경우 정보주체의 동의를 얻어 필요 최소한의 범위로만
                   제공합니다.
                   - 복사/대출 배송 서비스를 위해서 아래와 같이 개인정보를 제공합니다.
                        1. 개인정보 제공 대상 : 제공도서관, ㈜이니시스(선불결제 시)
                        2. 개인정보 제공 목적 : 복사/대출 서비스 제공
                        3. 개인정보 제공 항목 : 이름, 전화번호, 이메일
                        4. 개인정보 보유 및 이용 기간 : 신청건 발생일 후 5년
              ▶ 개인정보 제공에 동의하지 않을 권리가 있으며, 거부하는 경우 서비스 이용이 불가합니다.
              처리 위탁제6조(개인정보 처리업무의 위탁)
              RISS는 원활한 개인정보 업무처리를 위하여 다음과 같이 개인정보 처리업무를 위탁하고 있습니다.
              가. 위탁하는 업무 내용 : 회원 개인정보 처리
              나. 수탁업체명 : ㈜퓨쳐누리
              RISS는 위탁계약 체결 시 「개인정보 보호법」 제26조에 따라 위탁업무 수행 목적 외 개인정보 처리금지, 안전성 확보조치, 재위탁 제한, 수탁자에 대한 관리·감독, 손해배상 등 책임에 관한 사항을 계약서 등 문서에 명시하고, 수탁자가 개인정보를 안전하게 처리하는지를 감독하고 있습니다.
              위탁업무의 내용이나 수탁자가 변경될 경우에는 지체 없이 본 개인정보 처리방침을 통하여 공개하도록 하겠습니다.
              파기제7조(개인정보의 파기 절차 및 방법)
              가. 파기절차
                   - 개인정보의 파기 : 보유기간이 경과한 개인정보는 종료일로부터 지체 없이 파기
                   - 개인정보파일의 파기 : 개인정보파일의 처리 목적 달성, 해당 서비스의 폐지, 사업의 종료 등 그
                    개인정보파일이 불필요하게 되었을 때에는 개인정보의 처리가 불필요한 것으로 인정되는 날로부터
                    지체 없이 그 개인정보파일을 파기.
              나. 파기방법
                   - 전자적 형태의 정보는 기록을 재생할 수 없는 기술적 방법을 사용하여 파기.
                   - 종이에 출력된 개인정보는 분쇄기로 분쇄하거나 소각을 통하여 파기.
              정보주체의 권리의무제8조(정보주체와 법정대리인의 권리·의무 및 그 행사 방법)
              정보주체(만 14세 미만인 경우에는 법정대리인을 말함)는 개인정보주체로서 다음과 같은 권리를 행사할 수 있습니다.
              가. 권리 행사 항목 및 방법
                   - 권리 행사 항목: 개인정보 열람 요구, 오류 정정 요구, 삭제 요구, 처리정지 요구
                   - 권리 행사 방법: 개인정보 처리 방법에 관한 고시 별지 제8호(대리인의 경우 제11호) 서식에 따라
                    작성 후 서면, 전자우편, 모사전송(FAX), 전화, 인터넷(홈페이지 고객센터) 제출
              나. 개인정보 열람 및 처리정지 요구는 「개인정보 보호법」 제35조 제5항, 제37조 제2항에 의하여
                    정보주체의 권리가 제한 될 수 있음
              다. 개인정보의 정정 및 삭제 요구는 다른 법령에서 그 개인정보가 수집 대상으로 명시되어 있는 경우에는
                    그 삭제를 요구할 수 없음
              라. RISS는 정보주체 권리에 따른 열람의 요구, 정정·삭제의 요구, 처리정지의 요구 시
                    열람 등 요구를 한 자가 본인이거나 정당한 대리인인지를 확인함.
              마. 정보주체의 권리행사 요구 거절 시 불복을 위한 이의제기 절차는 다음과 같습니다.
                   1) 해당 부서에서 열람 등 요구에 대한 연기 또는 거절 시 요구 받은 날로부터 10일 이내에 정당한 사유
                      및 이의제기 방법 등을 통지
                   2) 해당 부서에서 정보주체의 이의제기 신청 및 접수(서면, 유선, 이메일 등)하여 개인정보보호 담당자가
                      내용 확인
                   3) 개인정보관리책임자가 처리결과에 대한 최종 검토
                   4) 해당부서에서 정보주체에게 처리결과 통보
              *. [교육부 개인정보 보호지침 별지 제1호] 개인정보 (열람, 정정·삭제, 처리정지) 요구서
              *. [교육부 개인정보 보호지침 별지 제2호] 위임장
              안전성확보조치제9조(개인정보의 안전성 확보조치)
              가. 내부관리계획의 수립 및 시행 : RISS의 내부관리계획 수립 및 시행은 한국교육학술정보원의 내부
                    관리 지침을 준수하여 시행.
              나. 개인정보 취급 담당자의 최소화 및 교육
                   - 개인정보를 취급하는 분야별 담당자를 지정․운영
                   - 한국교육학술정보원의 내부 관리 지침에 따른 교육 실시
              다. 개인정보에 대한 접근 제한
                   - 개인정보를 처리하는 데이터베이스시스템에 대한 접근권한의 부여, 변경, 말소를 통하여
                   개인정보에 대한 접근통제 실시
                   - 침입차단시스템, ID/패스워드 및 공인인증서 확인을 통한 접근 통제 등 보안시스템 운영
              라. 접속기록의 보관 및 위변조 방지
                   - 개인정보처리시스템에 접속한 기록(웹 로그, 요약정보 등)을 2년 이상 보관, 관리
                   - 접속 기록이 위변조 및 도난, 분실되지 않도록 보안기능을 사용
              마. 개인정보의 암호화 : 이용자의 개인정보는 암호화 되어 저장 및 관리
              바. 해킹 등에 대비한 기술적 대책
                   - 보안프로그램을 설치하고 주기적인 갱신·점검 실시
                   - 외부로부터 접근이 통제된 구역에 시스템을 설치하고 기술적/물리적으로 감시 및 차단
              사. 비인가자에 대한 출입 통제
                   - 개인정보를 보관하고 있는 개인정보시스템의 물리적 보관 장소를 별도 설치․운영
                   - 물리적 보관장소에 대한 출입통제, CCTV 설치․운영 절차를 수립, 운영
              자동화 수집제10조(개인정보 자동 수집 장치의 설치·운영 및 거부)
              가. 정보주체의 이용정보를 저장하고 수시로 불러오는 ‘쿠키(cookie)’를 사용합니다.
              나. 쿠키는 웹사이트를 운영하는데 이용되는 서버(http)가 이용자의 컴퓨터브라우저에게 보내는 소량의
                   정보이며 이동자들의 PC 컴퓨터내의 하드디스크에 저장되기도 합니다.
                   1) 쿠키의 사용목적 : 이용자에게 보다 편리한 서비스 제공하기 위해 사용됩니다.
                   2) 쿠키의 설치·운영 및 거부 : 브라우저 옵션 설정을 통해 쿠키 허용, 쿠키 차단 등의 설정을 할 수
                        있습니다.
                        - Internet Explorer : 웹브라우저 우측 상단의 도구 메뉴 > 인터넷 옵션 > 개인정보 > 설정 > 고급
                        - Edge : 웹브라우저 우측 상단의 설정 메뉴 > 쿠키 및 사이트 권한 > 쿠키 및 사이트 데이터
                           관리 및 삭제
                        - Chrome : 웹브라우저 우측 상단의 설정 메뉴 > 보안 및 개인정보 보호 > 쿠키 및 기타 사이트
                           데이터
                   3) 쿠키 저장을 거부 또는 차단할 경우 서비스 이용에 어려움이 발생할 수 있습니다.
              개인정보보호책임자제11조(개인정보 보호책임자)
              가. RISS는 개인정보 처리에 관한 업무를 총괄해서 책임지고, 개인정보 처리와 관련한 정보주체의
                   불만처리 및 피해구제 등을 위하여 아래와 같이 개인정보 보호책임자를 지정하고 있습니다.
              구분 담당자 연락처
              KERIS 개인정보 보호책임자 정보보호본부 김태우 - 이메일 : lsy@keris.or.kr
              - 전화번호 : 053-714-0439
              - 팩스번호 : 053-714-0195
              KERIS 개인정보 보호담당자 개인정보보호부 이상엽
              RISS 개인정보 보호책임자 대학학술본부 장금연 - 이메일 : giltizen@keris.or.kr
              - 전화번호 : 053-714-0149
              - 팩스번호 : 053-714-0194
              RISS 개인정보 보호담당자 학술진흥부 길원진

              나. 정보주체는 RISS의 서비스(또는 사업)을 이용하시면서 발생한 모든 개인정보 보호 관련 문의, 불만처리,
                   피해구제 등에 관한 사항을 개인정보 보호책임자 및 담당부서로 문의 할 수 있습니다.
                   RISS는 정보주체의 문의에 대해 답변 및 처리해드릴 것입니다.
              열람 청구제12조(개인정보의 열람청구를 접수·처리하는 부서)
              가. 자체 개인정보 열람청구 접수ㆍ처리 창구
                   부서명 : 대학학술본부/학술진흥부
                   담당자 : 길원진
                   이메일 : giltizen@keris.or.kr
                   전화번호 : 053-714-0149
                   팩스번호 : 053-714-0194
              나. 개인정보 열람청구 접수ㆍ처리 창구
                   - 개인정보보호 포털 웹사이트(www.privacy.go.kr)
                   - 개인정보보호 포털 → 민원마당 → 개인정보 열람 등 요구(본인확인을 위한
                     휴대전화·아이핀(I-PIN) 등이 있어야 함)
              권익침해 구제제13조(정보주체의 권익침해에 대한 구제방법)
              ‣ 정보주체는 개인정보침해로 인한 구제를 받기 위하여 개인정보분쟁조정위원회, 한국인터넷진흥원
                 개인정보침해신고센터 등에 분쟁해결이나 상담 등을 신청할 수 있습니다. 이 밖에 기타 개인정보
                 침해의 신고, 상담에 대하여는 아래의 기관에 문의하시기 바랍니다.

                 가. 개인정보분쟁조정위원회 : (국번없이) 1833-6972(www.kopico.go.kr)
                 나. 개인정보침해신고센터 : (국번없이) 118(privacy.kisa.or.kr)
                 다. 대검찰청 : (국번없이) 1301 (www.spo.go.kr)
                 라. 경찰청 : (국번없이) 182 (ecrm.cyber.go.kr)

              ‣RISS는 정보주체의 개인정보자기결정권을 보장하고, 개인정보침해로 인한 상담 및 피해 구제를
                  위해 노력하고 있으며, 신고나 상담이 필요한 경우 아래의 담당부서로 연락해 주시기 바랍니다.
                 ▶ 개인정보 관련 고객 상담 및 신고
                    부서명 : 학술진흥부
                    담당자 : 길원진
                    연락처 : ☎053-714-0149 / (Mail) giltizen@keris.or.kr / (Fax) 053-714-0194
              ‣「개인정보 보호법」제35조(개인정보의 열람), 제36조(개인정보의 정정·삭제), 제37조(개인정보의
                 처리정지 등)의 규정에 의한 요구에 대하여 공공기관의 장이 행한 처분 또는 부작위로 인하여 권리
                 또는 이익의 침해를 받은 자는 행정심판법이 정하는 바에 따라 행정심판을 청구할 수 있습니다.
                 ※ 행정심판에 대해 자세한 사항은 중앙행정심판위원회(www.simpan.go.kr) 홈페이지를 참고
                 하시기 바랍니다.
              처리방침 변경제14조(추가적인 이용ㆍ제공 판단기준)
              RISS는 「개인정보 보호법」제15조제3항 및 제17조제4항에 따라 「개인정보 보호법 시행령」
              제14조의2에 따른 사항을 고려하여 정보주체의 동의 없이 개인정보를 추가적으로 이용 · 제공할 수 있습니다.
              이에 따라 RISS는 정보주체의 동의 없이 추가적인 이용 · 제공을 하는 경우, 본 개인정보처리방침을
              통해 아래와 같은 추가적인 이용 · 제공을 위한 고려사항에 대한 판단기준을 안내드리겠습니다.
                   ▶ 개인정보를 추가적으로 이용 · 제공하려는 목적이 당초 수집 목적과 관련성이 있는지 여부
                   ▶ 개인정보를 수집한 정황 또는 처리 관행에 비추어 볼 때 추가적인 이용 · 제공에 대한 예측
                        가능성이 있는지 여부
                   ▶ 개인정보의 추가적인 이용 · 제공이 정보주체의 이익을 부당하게 침해하는지 여부
                   ▶ 가명처리 또는 암호화 등 안전성 확보에 필요한 조치를 하였는지 여부
              처리방침 변경제15조(개인정보 처리방침의 변경)
              RISS는 「개인정보 보호법」제30조에 따라 개인정보 처리방침을 변경하는 경우 정보주체가 쉽게
              확인할 수 있도록 홈페이지에 공개하고 변경이력을 관리하고 있습니다.
              ‣ 이 개인정보처리방침은 2023. 1. 31. 부터 적용됩니다.
              ‣ 이전의 개인정보처리방침은 상단에서 확인할 수 있습니다.

              자동로그아웃 안내

              닫기

              인증오류 안내

              닫기

              귀하께서는 휴면계정 전환 후 1년동안 회원정보 수집 및 이용에 대한
              재동의를 하지 않으신 관계로 개인정보가 삭제되었습니다.

              (참조 : RISS 이용약관 및 개인정보처리방침)

              신규회원으로 가입하여 이용 부탁 드리며, 추가 문의는 고객센터로 연락 바랍니다.

              - 기존 아이디 재사용 불가

              휴면계정 안내

              RISS는 [표준개인정보 보호지침]에 따라 2년을 주기로 개인정보 수집·이용에 관하여 (재)동의를 받고 있으며, (재)동의를 하지 않을 경우, 휴면계정으로 전환됩니다.

              (※ 휴면계정은 원문이용 및 복사/대출 서비스를 이용할 수 없습니다.)

              휴면계정으로 전환된 후 1년간 회원정보 수집·이용에 대한 재동의를 하지 않을 경우, RISS에서 자동탈퇴 및 개인정보가 삭제처리 됩니다.

              고객센터 1599-3122

              ARS번호+1번(회원가입 및 정보수정)